Component Description Status
AOMAft-Optics ModuleGreen
DCMDetector Cooler ModuleGreen
ICTInternal Calibration TargetGreen
IFCInstrument Flight ComputerGreen
IMInterferometer ModuleGreen
LW FPALongwave Focal Plane ArrayGreen
LW SPLongwave Signal ProcessorGreen
MW FPAMidwave Focal Plane ArrayGreen
MW SPMidwave Signal ProcessorRed
OMAOpto-Mechanical AssemblyGreen
PCEProcessing/Control ElectronicsGreen
PSAPower Supply AssemblyGreen
SHSurvival HeatersGreen
SSMScene Select ModuleGreen
SW FPAShortwave Focal Plane ArrayGreen
SW SPShortwave Signal ProcessorGreen
TMTelescope ModuleGreen
WHWarmup HeatersGreen


Subsystem History:

Date Time Component Description
05/01/201412:00:00 SNPP became Prime PM Mission.
05/01/2014AOMSNPP became Prime PM Mission
05/01/2014DCMSNPP became Prime PM Mission
05/01/2014ICTSNPP became Prime PM Mission
05/01/2014IFCSNPP became Prime PM Mission
05/01/2014IMSNPP became Prime PM Mission
05/01/2014LW FPASNPP became Prime PM Mission
05/01/2014LW SPSNPP became Prime PM Mission
05/01/2014MW FPASNPP became Prime PM Mission
05/01/2014MW SPSNPP became Prime PM Mission
05/01/2014OMASNPP became Prime PM Mission
05/01/2014PCESNPP became Prime PM Mission
05/01/2014PSASNPP became Prime PM Mission
05/01/2014SHSNPP became Prime PM Mission
05/01/2014SSMSNPP became Prime PM Mission
05/01/2014SW FPASNPP became Prime PM Mission
05/01/2014SW SPSNPP became Prime PM Mission
05/01/2014TMSNPP became Prime PM Mission
05/01/2014WHSNPP became Prime PM Mission