Topic: Weekly
Operations Schedule - Week 46 Issue 2 (Announcement 4281
removed, Announcement 4286 added)
Date/Time Issued: November 09,2018 1105Z
Product(s)
or Data Impacted: See list below.
Date/Time
of Initial Impact: November 09, 2018 09:19:07Z
(from the Eumetsat Weekly Operations Schedule message)
Date/Time
of Expected End: See table in detail for on and off
switch time
Length of
Outage: N/A
Details/Specifics of Change:
5267 | |
|
Fri Nov 09 09:19:07 GMT+00:00 2018 |
|
Planned Maintenance |
|
3867 |
|
3 |
|
2018-06-04 19:02:00.0 |
|
2018-11-30 23:59:00.0 |
|
Metop-A |
|
ASCAT |
|
instrument-calibration |
|
data-unavailable |
|
ASCAT Extensive Maintenance. Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey during the mentioned period.[Rev2]: Updated End time and date. [Rev3]: End date updated. |
|
scheduled |
|
2018-05-30 12:41:54.0 |
|
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A EARS-ASCAT ASCAT AHRPT Metop-A OSI SAF - Products |
|
Service Enhancement |
|
4284 |
|
1 |
|
2018-11-12 10:00:00.0 |
|
2018-11-12 10:00:00.0 |
|
new-product |
|
Release of Sentinel-3B Sea and Land Surface Temperature Radiometer (SLSTR) Level-1B data at Near Real Time timeliness. For full details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4131688.html |
|
scheduled |
|
2018-11-08 14:32:43.0 |
|
SLSTR Level 1 Products - S3B |
|
Planned Maintenance |
|
4286 |
|
1 |
|
2018-11-12 14:19:00.0 |
|
2018-11-12 14:26:00.0 |
|
Metop-B |
|
ASCAT |
|
instrument-calibration |
|
data-unavailable |
|
Gain Compression |
|
scheduled |
|
2018-11-09 07:54:27.0 |
|
ASCAT Soil Moisture - Metop-B ASCAT Level 1 - Metop-B EARS-ASCAT ASCAT AHRPT Metop-B OSI SAF - Products |
|
Planned Maintenance |
|
4277 |
|
1 |
|
2018-11-13 08:42:00.0 |
|
2018-11-13 08:49:00.0 |
|
Metop-B |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2018-11-07 15:26:45.0 |
|
SEM L0 - Metop-B SEM AHRPT Metop-B |
|
Planned Maintenance |
|
4278 |
|
1 |
|
2018-11-13 08:42:00.0 |
|
2018-11-13 10:25:00.0 |
|
Metop-B |
|
SEM |
|
TED |
|
instrument-calibration |
|
data-unavailable |
|
SEM TED in flight calibration. |
|
scheduled |
|
2018-11-07 15:27:37.0 |
|
SEM L0 - Metop-B SEM AHRPT Metop-B |
|
Planned Maintenance |
|
4257 |
|
1 |
|
2018-11-13 09:00:00.0 |
|
2018-12-13 09:00:00.0 |
|
MET-10 |
|
yearly-RSS-interruption |
|
data-unavailable |
|
Yearly interruption. Meteosat-10 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment Maintenance. Meteosat-9 RSS image data, rectified to 9.5 deg E, replaces the Meteosat-10 service. The RSS meteorological product service is not available during this timeframe. An outage of 5 minutes can be expected when switching to and from Meteosat-9. Note: During this one-month period, Meteosat-9 will be the back-up spacecraft for Meteosat-11 0-degree service. So in the event of a Meteosat-11 anomaly, Meteosat-9 RSS gap-filling mission will stop and no RSS data will be available. |
|
scheduled |
|
2018-10-25 14:02:13.0 |
|
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
|
Planned Maintenance |
|
4276 |
|
1 |
|
2018-11-13 09:19:00.0 |
|
2018-11-13 09:26:00.0 |
|
Metop-A |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2018-11-07 15:25:56.0 |
|
SEM L0 - Metop-A SEM AHRPT Metop-A |
|
Planned Maintenance |
|
4283 |
|
1 |
|
2018-11-14 06:00:00.0 |
|
2018-11-22 15:00:00.0 |
|
ground-segment-maintenance |
|
permanent-interruption |
|
Athens/Kavouri major ground station maintenance in order to upgrade the station. The station will not be available at all during the mentioned period. |
|
scheduled |
|
2018-11-07 15:40:15.0 |
|
EARS-AVHRR EARS-ATOVS EARS-ASCAT EARS-IASI EARS-ATMS EARS-VASS EARS-VIIRS EARS-CrlS EARS-NWC |
|
Planned Maintenance |
|
4282 |
|
1 |
|
2018-11-15 09:00:00.0 |
|
2018-11-15 10:00:00.0 |
|
ground-segment-maintenance |
|
risk-of-interruption |
|
EUMETView maintenance. Service disruption can be expected during the indicated time period. |
|
scheduled |
|
2018-11-07 15:34:38.0 |
|
Web Service |
|
Planned Maintenance |
|
4279 |
|
1 |
|
2018-11-16 18:50:00.0 |
|
2018-11-16 19:49:00.0 |
|
Metop-A |
|
GOME-2 |
|
instrument-calibration |
|
data-unavailable |
|
GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
|
scheduled |
|
2018-11-07 15:28:50.0 |
|
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
|
Planned Maintenance |
|
4280 |
|
1 |
|
2018-11-16 19:44:00.0 |
|
2018-11-16 20:43:00.0 |
|
Metop-B |
|
GOME-2 |
|
instrument-calibration |
|
data-unavailable |
|
GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
|
scheduled |
|
2018-11-07 15:29:52.0 |
|
GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
|
Planned Maintenance |
|
4270 |
|
1 |
|
2019-01-21 09:00:00.0 |
|
2019-01-28 09:00:00.0 |
|
MET-11 |
|
instrument-decontamination |
|
data-unavailable |
|
Instrument decontamination. MET-9 will cover the service during the decontamination period. An outage of up to two repeat cycles can be expected when switching to and from Meteosat-9. For full details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4127087.html |
|
scheduled |
|
2018-10-31 16:22:32.0 |
|
0M-0 SEVIRI Level 1.5 Image Data 0M-0 Meteosat Meteorological Products |
|
EUMETSAT |
|
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
|
+49 6151 807 3660/3770 |
|
+49 6151 807 3790 |
|
ops@eumetsat.int |
|
www.eumetsat.int |