Topic:
Weekly
Operations Schedule - Week 3 Issue 2 (Addition of
Announcements 4442, 4443 and 4444)
Date/Time Issued: January 11, 2019 1516Z
Product(s)
or Data Impacted: See list below.
Date/Time
of Initial Impact: January 11, 2019
14:35:26 (from the Eumetsat Weekly
Operations Schedule message)
Date/Time
of Expected End: See table in detail for on and
off switch time
Length
of Outage: N/A
Details/Specifics of Change:
5435 | |
|
Fri Jan 11 14:35:26 GMT+00:00 2019 |
|
Planned Maintenance |
|
3867 |
|
5 |
|
2018-06-04 19:02:00.0 |
|
2019-02-03 23:59:00.0 |
|
Metop-A |
|
ASCAT |
|
instrument-calibration |
|
data-unavailable |
|
ASCAT Extensive Maintenance. Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey during the mentioned period.[Rev2]: Updated End time and date. [Rev3]: End date updated.[Rev4]: End date updated. [Rev5] End date updated. |
|
scheduled |
|
2018-12-05 16:12:38.0 |
|
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A EARS-ASCAT ASCAT AHRPT Metop-A OSI SAF - Products |
|
Planned Maintenance |
|
4360 |
|
1 |
|
2018-12-31 00:00:00.0 |
|
2019-03-18 00:00:00.0 |
|
Metop-A |
|
GOME-2 |
|
general-announcement |
|
risk-of-interruption |
|
The Metop-A satellite with GOME-2 on-board is currently in drifting orbit. As a consequence there are periods during which the GOME-2 instrument will not be able to carry out its daily solar calibration measurement. The second such period will be from 31 December 2018 to 17 March 2019. During this period, the solar mean reference spectrum provided in the Metop-A GOME-2 level-1B product will be automatically replaced by a modelled solar spectrum using information on solar activity from Metop-B. Therefore, it is expected that the quality of both level-1B and level-2 products might undergo slight changes during this period, and there will be an associated risk of degraded product quality for Metop-A GOME-2 products. |
|
scheduled |
|
2019-01-11 07:54:54.0 |
|
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
|
Service Enhancement |
|
4443 |
|
1 |
|
2019-01-11 01:00:00.0 |
|
FY-2E |
|
service-change |
|
The FY-2E satellite at 86.5 deg East has been replaced by the FY-2H satellite at 79 deg East as of 11th Jan 2019. The dissemination of FY-2H products will start as soon as they are available to EUMETSAT. |
|
2019-01-11 14:32:38.0 |
|
FY-2 Products |
|
Planned Maintenance |
|
4432 |
|
1 |
|
2019-01-14 07:00:00.0 |
|
2019-01-14 11:00:00.0 |
|
ground-segment-maintenance |
|
risk-of-interruption |
|
AC SAF will update the software of the ozone profiles and absorbing aerosol index to work around the missing solar irradiance error in the L1b product. The main purpose is to handle the fill values in the irradiance error from the temporary Solar Model spectrum of GOME-2A. |
|
scheduled |
|
2019-01-09 13:35:56.0 |
|
AC SAF - Products |
|
Service Enhancement |
|
4335 |
|
1 |
|
2019-01-14 09:00:00.0 |
|
2019-01-14 09:00:00.0 |
|
product-change |
|
Update to AC SAF IASI SO2 BUFR product. For more details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4156656.html |
|
scheduled |
|
2018-11-28 15:11:14.0 |
|
AC SAF - Products |
|
Planned Maintenance |
|
4444 |
|
1 |
|
2019-01-15 08:30:00.0 |
|
2019-01-15 14:00:00.0 |
|
general-announcement |
|
risk-of-interruption |
|
EO portal, EUMETView and online Real-Time Imagery essential software maintenance. The services are expected to be unavailable or disrupted during the maintenance period. |
|
scheduled |
|
2019-01-11 14:31:13.0 |
|
Web Service |
|
Planned Maintenance |
|
4438 |
|
1 |
|
2019-01-15 08:40:00.0 |
|
2019-01-15 08:47:00.0 |
|
Metop-B |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2019-01-09 14:30:20.0 |
|
SEM L0 - Metop-B SEM AHRPT Metop-B |
|
Planned Maintenance |
|
4436 |
|
1 |
|
2019-01-15 09:13:00.0 |
|
2019-01-15 09:20:00.0 |
|
Metop-A |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2019-01-09 14:28:54.0 |
|
SEM L0 - Metop-A SEM AHRPT Metop-A |
|
Planned Maintenance |
|
4437 |
|
1 |
|
2019-01-15 09:13:00.0 |
|
2019-01-15 10:56:00.0 |
|
Metop-A |
|
SEM |
|
TED |
|
instrument-calibration |
|
data-unavailable |
|
SEM TED in flight calibration. |
|
scheduled |
|
2019-01-09 14:27:22.0 |
|
SEM L0 - Metop-A SEM AHRPT Metop-A |
|
Planned Maintenance |
|
4433 |
|
1 |
|
2019-01-16 00:00:00.0 |
|
2019-01-17 00:00:00.0 |
|
Metop-A |
|
instrument-maintenance |
|
data-unavailable |
|
MHS H2 Gain Update from 1 to 2 dB. An outage of a few minutes might be observed during the maintenance window. |
|
scheduled |
|
2019-01-11 07:54:04.0 |
|
MHS AHRPT Metop-A |
|
Planned Maintenance |
|
4442 |
|
1 |
|
2019-01-16 09:00:00.0 |
|
2019-01-16 10:30:00.0 |
|
EUMETCast maintenance |
|
risk-of-interruption |
|
Software Update. Two Interruptions causing delays in data delivery of up to three minutes and data losses can be expected at 09:30 and 10:15 UTC. Furthermore a low risk of data interruption may be observed in the maintenance period. |
|
scheduled |
|
2019-01-11 10:51:21.0 |
|
EUMETCast-Africa EUMETCast-Europe |
|
Planned Maintenance |
|
4434 |
|
1 |
|
2019-01-17 09:01:00.0 |
|
2019-01-17 09:09:00.0 |
|
Suomi NPP |
|
VIIRS Lunar Roll |
|
data-unavailable |
|
Lunar Calibration. |
|
scheduled |
|
2019-01-09 13:57:36.0 |
|
ATMS Level 1 - Suomi-NPP CrlS Level 1 - Suomi-NPP VIIRS EDR - Suomi-NPP EARS-CrlS EARS-ATMS EARS-VIIRS Marine Products - Suomi-NPP Atmospheric Products - Suomi-NPP |
|
Planned Maintenance |
|
4435 |
|
1 |
|
2019-01-17 09:53:00.0 |
|
2019-01-17 10:01:00.0 |
|
NOAA-20 |
|
VIIRS Lunar Roll |
|
data-unavailable |
|
Lunar Calibration. |
|
scheduled |
|
2019-01-09 14:00:22.0 |
|
SNPP-JPSS |
|
Planned Maintenance |
|
4270 |
|
2 |
|
2019-01-21 09:00:00.0 |
|
2019-01-28 09:00:00.0 |
|
MET-11 |
|
instrument-decontamination |
|
data-unavailable |
|
Instrument decontamination. Meteosat-9 will cover the service during the decontamination period. An outage of up to two repeat cycles can be expected when switching to and from Meteosat-9. For full details, see the URL provided below. [Rev. 2]: Meteosat-9 data will also be disseminated one week before and one week after Meteosat-11 decontamination, i.e. from 14/01 to 04/02/2019. Users wishing to receive the parallel Meteosat data streams should register with our User Helpdesk (ops@eumetsat.int). For full details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4127087.html |
|
scheduled |
|
2018-12-13 10:40:41.0 |
|
0M-0 SEVIRI Level 1.5 Image Data 0M-0 Meteosat Meteorological Products |
Name: EUMETSAT
Address: Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: +49 6151 807 3660/3770
Fax: +49 6151 807 3790
E-mail: ops@eumetsat.int
Internet: www.eumetsat.int
You are receiving this email because you are subscribed to our
User Notification Service (UNS). You can modify your UNS
subscriptions or unsubscribe at any time via our UNS web interface
(login to our Earth Observation Portal required).
Any email message from EUMETSAT is sent in good faith but shall
neither be binding nor construed as constituting a commitment by
EUMETSAT, except where provided for in a written agreement or
contract or if explicitly stated in the email. Please note that
any views or opinions presented in this email are solely those of
the sender and do not necessarily represent those of EUMETSAT.
This message and any attachments are intended for the sole use of
the addressee(s) and may contain confidential and privileged
information. Any unauthorised use, disclosure, dissemination or
distribution (in whole or in part) of its contents is not
permitted. If you received this message in error, please notify
the sender and delete it from your system.