^M ^MTopic: GOES-16 SUVI guide telescope calibration scheduled for September 23-24, 2019
^MDate/Time Issued: September 19, 2019 1850Z
^MProduct(s) or Data Impacted: GOES-16 SUVI product outage and EXIS product degradation
^MDate/Time of Initial Impact: September 23, 2019 2300 UTC
^MDate/Time of Expected End: September 24, 2019 M-B0058 UTC
^MLength of Outage: 1 hour, 58 minutes
^MDetails/Specifics of Change:
^MGOES-16 Solar UltraViolet Imager (SUVI) will conduct a guide telescope calibration starting Monday September 23 at 2300 UTC through Tuesday September 24 at 0058 UTC. All SUVI products will experience an outage. All EXIS products will be flagged for offpoint during the calibration timeframe.