Details/Specifics of Change:
6391 | |
|
Mon Nov 18 15:21:07 GMT+00:00 2019 |
|
Service Enhancement |
|
4920 |
|
1 |
|
2019-06-27 09:00:00.0 |
|
2019-06-27 09:00:00.0 |
|
general-announcement |
|
There is an issue with the latest EUMETCast software package, affecting Linux operating systems when the Tellicast client software (version 2.14.5) is used in combination with the Safenet drivers. A new alpha version of Tellicast, with a fix of the issue, is available for download. See the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4451027.html |
|
2019-06-27 11:18:18.0 |
|
|
|
Planned Maintenance |
|
4952 |
|
1 |
|
2019-07-13 12:00:00.0 |
|
2019-11-30 13:00:00.0 |
|
GOES17 |
|
general-announcement |
|
data-degraded |
|
GOES-17 ABI Loop Heat Pipe anomaly will impact bands 8 through 16 in the given time period every day around 12:40 UTC. There will be a gradual degradation in image quality over one or several images with some complete outages. This process will cycle through varied degradation through November 30, 2019. The duration of the degradation and outage periods will vary by channel and by date. |
|
https://www.goes-r.gov/users/GOES-17-ABI-Performance.html |
|
scheduled |
|
2019-07-12 12:09:09.0 |
|
GOES Products |
|
Service Enhancement |
|
5128 |
|
1 |
|
2019-09-30 09:00:00.0 |
|
2019-12-15 09:00:00.0 |
|
Metop-A |
|
general-announcement |
|
risk-of-interruption |
|
Metop-A Technology Test Campaign I (one) execution: possible data disruptions or outages. More information will be given in specific instruments announcements. |
|
scheduled |
|
2019-09-04 12:26:30.0 |
|
|
|
Planned Maintenance |
|
5266 |
|
2 |
|
2019-11-12 07:10:00.0 |
|
2019-11-18 13:00:00.0 |
|
Metop-A |
|
IASI |
|
general-announcement |
|
data-unavailable |
|
IASI special patch and dump activity aiming to reduce outage times in case of instrument switch off will cause a prolonged data outage. [REV 2] Change of affected services |
|
scheduled |
|
2019-11-18 08:57:37.0 |
|
IASI Level 1 - Metop-A IASI Sounding Products - Metop-A EARS-IASI IASI AHRPT Metop-A AC SAF - Products |
|
Planned Maintenance |
|
5355 |
|
1 |
|
2019-11-14 00:00:00.0 |
|
2020-04-15 00:00:00.0 |
|
Metop-A |
|
GOME-2 |
|
general-announcement |
|
data-unavailable |
|
The Metop-A satellite with GOME-2 on-board is currently in drifting orbit. As a consequence there are periods during which the GOME-2 instrument is not able to carry out its daily solar calibration measurement. The third such period will be from 14 November 2019 to 14 April 2020. During this period, the solar mean reference spectrum provided in the Metop-A GOME-2 level-1B product will be automatically replaced by a modelled solar spectrum using information on solar activity from Metop-B. Therefore, it is expected that the quality of both level-1B and level-2 products might undergo slight changes during this period, and there will be an associated risk of degraded product quality for Metop-A GOME-2 products. |
|
scheduled |
|
2019-11-18 09:20:32.0 |
|
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
|
Planned Maintenance |
|
5354 |
|
1 |
|
2019-11-16 00:00:00.0 |
|
2019-11-24 05:15:00.0 |
|
Metop-B |
|
ground-segment-maintenance |
|
data-delayed |
|
McMurdo annual preventive Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. The maintenance will take place daily between around 00:00 and 05:15 UTC in the maintenance period. |
|
scheduled |
|
2019-11-14 16:27:31.0 |
|
AMSU-A Level 1 - Metop-B SEM L0 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B ASCAT Level 1 - Metop-B HIRS Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B GRAS Level 1 - Metop-B ATOVS Sounding products - Metop-B ASCAT Soil Moisture - Metop-B Multi-Sensor Products - Metop-B IASI Sounding Products - Metop-B AVHRR Polar Winds - Metop-B Multi-Metop Wind Products |
|
Planned Maintenance |
|
5323 |
|
2 |
|
2019-11-18 00:00:00.0 |
|
2019-12-16 00:00:00.0 |
|
Metop-A |
|
ASCAT |
|
general-announcement |
|
risk-of-interruption |
|
Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2]: End date updated. |
|
scheduled |
|
2019-11-13 14:58:20.0 |
|
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A |
|
Planned Maintenance |
|
5351 |
|
1 |
|
2019-11-18 05:15:00.0 |
|
2019-11-18 09:12:00.0 |
|
Metop-C |
|
IASI |
|
instrument-calibration |
|
data-unavailable |
|
scheduled |
|
2019-11-13 15:13:24.0 |
|
IASI Sounding products- Metop-C IASI Level 1 - Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
|
Planned Maintenance |
|
5344 |
|
1 |
|
2019-11-18 08:30:00.0 |
|
2019-11-19 16:30:00.0 |
|
Sentinel-3A, Sentinel-3B |
|
ground-segment-maintenance |
|
risk-of-delay |
|
Risk period is daily from 08:30 to 16:30 during the dates mentioned in the Event Start/End fields. |
|
scheduled |
|
2019-11-13 13:43:47.0 |
|
OLCI Level 1 Products - S3A OLCI Level 2 Marine Products - S3A SLSTR Level 1 Products - S3A SLSTR Level 2 Marine Products - S3A SRAL Level 2 Marine Products - S3A SRAL Level 1 Products - S3A SLSTR Level 1 Products - S3B OLCI Level 1 Products - S3B SLSTR Level 2 Marine Products - S3B OLCI Level 2 Marine Products - S3B SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
|
Planned Maintenance |
|
5352 |
|
1 |
|
2019-11-18 14:12:00.0 |
|
2019-11-18 14:19:00.0 |
|
Metop-C |
|
ASCAT |
|
instrument-calibration |
|
data-unavailable |
|
Gain Compression |
|
scheduled |
|
2019-11-13 15:14:53.0 |
|
ASCAT Level 1 - Metop-C ASCAT Soil Moisture - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
|
Planned Maintenance |
|
5350 |
|
1 |
|
2019-11-19 08:35:00.0 |
|
2019-11-19 08:42:00.0 |
|
Metop-C |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2019-11-13 15:11:37.0 |
|
SEM L0 - Metop-C SEM AHRPT Metop-C |
|
Planned Maintenance |
|
5349 |
|
1 |
|
2019-11-19 09:09:00.0 |
|
2019-11-19 09:16:00.0 |
|
Metop-B |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2019-11-13 15:06:47.0 |
|
SEM L0 - Metop-B SEM AHRPT Metop-B |
|
Planned Maintenance |
|
5346 |
|
1 |
|
2019-11-19 09:35:00.0 |
|
2019-11-19 09:42:00.0 |
|
Metop-A |
|
SEM |
|
MEPED |
|
instrument-calibration |
|
data-unavailable |
|
SEM MEPED in flight calibration. |
|
scheduled |
|
2019-11-13 14:52:36.0 |
|
SEM L0 - Metop-A SEM AHRPT Metop-A |
|
Planned Maintenance |
|
5320 |
|
3 |
|
2019-11-20 11:08:00.0 |
|
2019-11-20 11:08:00.0 |
|
Metop-B |
|
in-plane-manoeuvre |
|
data-degraded |
|
Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. [Rev. 2] : Manoeuvre Execution time updated. Burn time: 11:08:40 UTC. Duration: 1.322 seconds. [Rev. 3] Duration changed to 2.140 seconds. |
|
scheduled |
|
2019-11-18 15:17:05.0 |
|
SEM L0 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B AMSU-A Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B IASI Sounding Products - Metop-B ATOVS Sounding products - Metop-B GOME-2 Level 1 - Metop-B ASCAT Soil Moisture - Metop-B GRAS Level 1 - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B A-DCS AHRPT Metop-B AMSU-A AHRPT Metop-B ASCAT AHRPT Metop-B AVHRR AHRPT Metop-B GOME-2 AHRPT Metop-B GRAS AHRPT Metop-B HIRS AHRPT Metop-B IASI AHRPT Metop-B MHS AHRPT Metop-B SEM AHRPT Metop-B |
|
Planned Maintenance |
|
5347 |
|
1 |
|
2019-11-22 04:51:00.0 |
|
2019-11-22 09:51:00.0 |
|
Metop-A |
|
IASI |
|
instrument-calibration |
|
data-unavailable |
|
External Calibration |
|
scheduled |
|
2019-11-13 14:53:37.0 |
|
IASI Level 1 - Metop-A IASI Sounding Products - Metop-A EARS-IASI OSI SAF - Products IASI AHRPT Metop-A |
|
Planned Maintenance |
|
5315 |
|
1 |
|
2019-11-25 00:00:00.0 |
|
2019-12-04 00:00:00.0 |
|
Metop-A |
|
AMSU-A |
|
general-announcement |
|
data-unavailable |
|
End of Life technology test for AMSU.Short interruptions can be expected during the testing. |
|
scheduled |
|
2019-10-30 13:40:07.0 |
|
AMSU-A Level 1 - Metop-A AMSU-A AHRPT Metop-A OSI SAF - Products |
|
Planned Maintenance |
|
5345 |
|
1 |
|
2019-11-27 12:00:00.0 |
|
2019-11-27 12:00:00.0 |
|
Sentinel-3A |
|
in-plane-manoeuvre |
|
data-degraded |
|
The exact times will be announced closer to the day of the manoeuvre. |
|
scheduled |
|
2019-11-13 14:06:12.0 |
|
OLCI Level 1 Products - S3A OLCI Level 2 Marine Products - S3A SLSTR Level 1 Products - S3A SLSTR Level 2 Marine Products - S3A SRAL Level 1 Products - S3A SRAL Level 2 Marine Products - S3A |
|
Service Enhancement |
|
5319 |
|
1 |
|
2019-11-28 09:00:00.0 |
|
2019-11-28 09:00:00.0 |
|
general-announcement |
|
The MODIS Total Precipitable Water products from NASA will stop being distributed on EUMETCast Europe. |
|
scheduled |
|
2019-10-30 16:09:06.0 |
|
MODIS Products |
|
Service Enhancement |
|
5356 |
|
1 |
|
2019-11-28 09:00:00.0 |
|
2019-11-28 09:00:00.0 |
|
new-product |
|
New Heat Flux products from LSA SAF to be available on EUMETCast. For full details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4721427.html |
|
scheduled |
|
2019-11-13 16:59:23.0 |
|
LSA SAF - Products |
|
Service Enhancement |
|
5357 |
|
1 |
|
2019-11-28 09:00:00.0 |
|
2019-11-28 09:00:00.0 |
|
new-product |
|
Metop-C ASCAT Winds from OSI SAF to be available on EUMETCast. For full details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4721035.html |
|
scheduled |
|
2019-11-13 17:02:06.0 |
|
OSI SAF - Products |
|
Planned Maintenance |
|
5330 |
|
1 |
|
2019-12-04 12:00:00.0 |
|
2019-12-04 12:00:00.0 |
|
Metop-C |
|
out-of-plane-manoeuvre |
|
Out-of-plane manoeuvre. Some instrument data will be unavailable or degraded during this period.The exact burn time and instrument affected outage will be announced closer to the day of the manoeuvre. Reduced data quality should be expected for data sensed during this period |
|
scheduled |
|
2019-11-06 14:52:03.0 |
|
SEM L0 - Metop-C AVHRR Level 1 - Metop-C IASI Sounding products- Metop-C AMSU-A Level 1 - Metop-C MHS Level 1 - Metop-C Multi-sensor Products - Metop-C IASI Level 1 - Metop-C EARS-AVHRR EARS-ATOVS EARS-IASI AVHRR AHRPT Metop-C A-DCS AHRPT Metop-C HIRS AHRPT Metop-C AMSU-A AHRPT Metop-C IASI AHRPT Metop-C MHS AHRPT Metop-C SEM AHRPT Metop-C |
|
Service Enhancement |
|
5295 |
|
1 |
|
2019-12-05 09:00:00.0 |
|
2019-12-05 09:00:00.0 |
|
product-change |
|
Release of new IASI Level 2 PPF (Product Processing Facility) version 6.5. For full details and test data, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4686627.html |
|
scheduled |
|
2019-10-24 08:37:28.0 |
|
IASI Sounding Products - Metop-B IASI Sounding Products - Metop-A IASI Sounding products- Metop-C AC SAF - Products |
|
Planned Maintenance |
|
5353 |
|
1 |
|
2019-12-10 09:00:00.0 |
|
2019-12-10 09:00:00.0 |
|
Metop-B |
|
IASI |
|
instrument-calibration |
|
data-unavailable |
|
IASI TOP upload (on-board processing update). Users should expect an instrument outage of around 50 minute at some point on that day. The coding table will be updated. There will be no change to the reduced spectra. The exact time will be announced closer to the event |
|
scheduled |
|
2019-11-13 15:21:50.0 |
|
IASI Level 1 - Metop-B IASI Sounding Products - Metop-B EARS-IASI IASI AHRPT Metop-B OSI SAF - Products |
|
Planned Maintenance |
|
5348 |
|
2 |
|
2019-12-10 09:00:00.0 |
|
2019-12-12 09:00:00.0 |
|
Metop-A |
|
in-plane-manoeuvre |
|
data-unavailable |
|
An Attitude manoeuvre will be performed in the period between 2019/12/10 and 2019/12/12. During the period, the yaw will be modified by 4 degrees and then return to the nominal attitude. The exact date, time and duration of the attitude change will be announced closer to the day of the manoeuvre. Reduced data quality should be expected for data sensed during this period. [Rev. 2]: This manoeuvre has been cancelled. |
|
scheduled |
|
2019-11-18 15:15:04.0 |
|
AVHRR Level 1 - Metop-A AMSU-A Level 1 - Metop-A SEM L0 - Metop-A MHS Level 1 - Metop-A HIRS Level 1 - Metop-A IASI Level 1 - Metop-A IASI Sounding Products - Metop-A Multi-Sensor Products - Metop-A ATOVS Sounding products - Metop-A EARS-ATOVS EARS-IASI EARS-AVHRR A-DCS AHRPT Metop-A AMSU-A AHRPT Metop-A HIRS AHRPT Metop-A MHS AHRPT Metop-A IASI AHRPT Metop-A SEM AHRPT Metop-A AVHRR AHRPT Metop-A |
|
Service Enhancement |
|
5293 |
|
1 |
|
2019-12-12 09:00:00.0 |
|
2019-12-12 09:00:00.0 |
|
service-change |
|
Regional EARS data from the USA will no longer be available on EUMETCast from 12/12/2019. For more details, see the URL provided below. |
|
https://www.eumetsat.int/website/home/News/DAT_4682634.html |
|
scheduled |
|
2019-10-23 12:49:46.0 |
|
EARS-ATOVS |
|
Service Enhancement |
|
5159 |
|
1 |
|
2020-06-01 09:00:00.0 |
|
2020-06-01 09:00:00.0 |
|
product-change |
|
A new BUFR encoding sequence will be introduced in June 2020 for all EUMETSATM-bM-^@M-^Ys wind products. For full details and sample files, see the URL provided below. |
|
http://www.eumetsat.int/website/home/News/DAT_4593260.html |
|
scheduled |
|
2019-09-11 16:22:14.0 |
|
0M-0 Meteosat Meteorological Products RSS Meteosat Meteorological Products IODC Meteosat Meteorological Products AVHRR Polar Winds - Metop-A AVHRR Polar Winds - Metop-B AVHRR Polar winds - Metop-C Multi-Metop Wind Products |
|
EUMETSAT |
|
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
|
+49 6151 807 3660/3770 |
|
+49 6151 807 3790 |
|
ops@eumetsat.int |
|
www.eumetsat.int |