Update #1:M-B
The GOES-16 Band 10 horizontal stripe anomaly was corrected.M-B Nominal
production and distribution of all GOES-16 Band-10 products resumed on
31 December 2019 at 1600Z.M-B The length of this anomaly was 22 hours 41
min. M-B M-B M-B M-B
Topic:M-B Degradation
(horizontal stripes) of all GOES-16 ABI Band-10 products, derived
products and their distribution to AWIPS, GRB and PDAM-B
Date/Time Issued:M-B December 31, 2019 1645Z
Product(s) or Data Impacted:M-B All GOES-16 ABI Band-10 products (L1b, L2, Sectorized), derived products and their distribution to AWIPS, GRB and PDAM-BM-BM-B
Date/Time of Initial Impact:M-B December 30, 2019 1719Z
Date/Time of Expected End:M-B December 31, 2019 1600Z M-BM-B
Length of Event:M-B 22 hours 41 minutes. M-B M-B
Details/Specifics of Change:M-B Degradation (horizontal stripes) of all GOES-16 ABI Band-10 products, derived products and their distribution to AWIPS, GRB and PDA due to an anomaly. M-B