Topic:M-B Eumetsat Weekly Operations Schedule - Week 50 Issue 6 (Addition of announcements 5461 and 5462)

Date/Time Issued: December 13, 2019 1305Z

Product(s) or Data Impacted:M-B See list below.

Date/Time of Initial Impact:M-B December 13, 2019 1255Z (from the Eumetsat Weekly Operations Schedule message)

Date/Time of Expected End:M-B See table in detail for on and off switch time M-B

Length of Outage:M-B N/A

Details/Specifics of Change:

Message number: M-BM-BM-B 6484
Message creation: M-BM-BM-B Fri Dec 13 12:55:15 GMT+00:00 2019


Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5461
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2019-12-14 04:30:00.0
End Time: M-BM-BM-B 2019-12-14 16:30:00.0
Satellites: M-BM-BM-B Metop-B
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B data-delayed
Detail: M-BM-BM-B McMurdo Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-13 08:10:09.0
Services: M-BM-BM-B AVHRR Level 1 - Metop-B
SEM L0 - Metop-B
AMSU-A Level 1 - Metop-B
MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
Multi-Sensor Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Metop Wind Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5462
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2019-12-15 04:30:00.0
End Time: M-BM-BM-B 2019-12-15 16:30:00.0
Satellites: M-BM-BM-B Metop-B
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B data-delayed
Detail: M-BM-BM-B McMurdo Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-13 08:11:05.0
Services: M-BM-BM-B SEM L0 - Metop-B
AVHRR Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
MHS Level 1 - Metop-B
HIRS Level 1 - Metop-B
ASCAT Level 1 - Metop-B
IASI Level 1 - Metop-B
ATOVS Sounding products - Metop-B
IASI Sounding Products - Metop-B
GRAS Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products

Name: M-BM-BM-B EUMETSAT
Address: M-BM-BM-B Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: M-BM-BM-B +49 6151 807 3660/3770
Fax: M-BM-BM-B +49 6151 807 3790
E-mail: M-BM-BM-B ops@eumetsat.int
Internet: M-BM-BM-B www.eumetsat.int

You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).

Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.