Date/Time Issued: January
06, 2020 1647Z
Product(s) or Data Impacted:M-B See list below.
Date/Time of Initial Impact:M-B January 06, 2020 16:37:37 UTCM-B (from
the Eumetsat Weekly Operations Schedule message)
Date/Time of Expected End:M-B See table in detail for on
and off switch timeM-B
Length of Outage:M-B N/A
Details/Specifics of Change:
Message number: | 6533 |
Message creation: | Mon Jan 06 16:37:37 GMT+00:00 2020 |
Type: | Service Enhancement |
Ann Nr: | 4920 |
Rev: | 1 |
Start Time: | 2019-06-27 09:00:00.0 |
End Time: | 2019-06-27 09:00:00.0 |
Subject: | general-announcement |
Detail: | There is an issue with the latest EUMETCast software package, affecting Linux operating systems when the Tellicast client software (version 2.14.5) is used in combination with the Safenet drivers. A new alpha version of Tellicast, with a fix of the issue, is available for download. See the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4451027.html |
Issue Time: | 2019-06-27 11:18:18.0 |
Services: |
|
Type: | Planned Maintenance |
Ann Nr: | 5355 |
Rev: | 1 |
Start Time: | 2019-11-14 00:00:00.0 |
End Time: | 2020-04-15 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | GOME-2 |
Subject: | general-announcement |
Impact: | data-degraded |
Detail: | The Metop-A satellite with GOME-2 on-board is currently in drifting orbit. As a consequence there are periods during which the GOME-2 instrument is not able to carry out its daily solar calibration measurement. The third such period will be from 14 November 2019 to 14 April 2020. During this period, the solar mean reference spectrum provided in the Metop-A GOME-2 level-1B product will be automatically replaced by a modelled solar spectrum using information on solar activity from Metop-B. Therefore, it is expected that the quality of both level-1B and level-2 products might undergo slight changes during this period, and there will be an associated risk of degraded product quality for Metop-A GOME-2 products. |
Status: | scheduled |
Issue Time: | 2019-12-27 10:06:36.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5323 |
Rev: | 3 |
Start Time: | 2019-11-18 00:00:00.0 |
End Time: | 2019-12-23 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2]: End date updated. [Rev. 3]: End date updated. |
Status: | scheduled |
Issue Time: | 2019-12-11 15:06:24.0 |
Services: |
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5402 |
Rev: | 2 |
Start Time: | 2019-12-04 14:00:00.0 |
End Time: | 2020-02-19 14:00:00.0 |
Satellites: | Metop-C |
Subject: | general-announcement |
Impact: | data-degraded |
Detail: | Drift to a new orbital position. During this period, Metop-C will not be following the reference orbit, with a drifting ground track and phase with respect to Metop-B. Some instrument products may be degraded. A small impact on the number and quality of AVHRR wind products might be observed during this period. [Rev. 2]: End date updated. |
Status: | scheduled |
Issue Time: | 2019-12-27 09:58:40.0 |
Services: |
AVHRR Level 1 - Metop-C SEM L0 - Metop-C AMSU-A Level 1 - Metop-C IASI Sounding products- Metop-C MHS Level 1 - Metop-C IASI Level 1 - Metop-C Multi-sensor Products - Metop-C EARS-ATOVS EARS-AVHRR EARS-IASI A-DCS AHRPT Metop-C AMSU-A AHRPT Metop-C HIRS AHRPT Metop-C AVHRR AHRPT Metop-C IASI AHRPT Metop-C SEM AHRPT Metop-C MHS AHRPT Metop-C |
Type: | Service Enhancement |
Ann Nr: | 5467 |
Rev: | 1 |
Start Time: | 2019-12-19 09:00:00.0 |
End Time: | 2019-12-19 09:00:00.0 |
Subject: | general-announcement |
Detail: | Sentinel-3A and -3B OLCI orbit prediction files for 2020 will be made available successively between now and end of January 2020. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4777627.html |
Status: | scheduled |
Issue Time: | 2019-12-18 15:21:29.0 |
Services: |
|
Type: | Service Enhancement |
Ann Nr: | 5468 |
Rev: | 1 |
Start Time: | 2019-12-19 09:00:00.0 |
End Time: | 2019-12-19 09:00:00.0 |
Subject: | general-announcement |
Detail: | EUMETSAT Polar System-Second Generation (EPS-SG) simulated IASI-NG Level 1D test data are now available for user familiarisation. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4782645.html |
Status: | scheduled |
Issue Time: | 2019-12-18 15:25:04.0 |
Services: |
|
Type: | Planned Maintenance |
Ann Nr: | 5473 |
Rev: | 1 |
Start Time: | 2019-12-23 14:48:00.0 |
End Time: | 2019-12-23 14:54:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2019-12-18 16:04:25.0 |
Services: |
ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A EARS-ASCAT ASCAT AHRPT Metop-A OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5479 |
Rev: | 1 |
Start Time: | 2019-12-24 08:06:00.0 |
End Time: | 2019-12-24 08:13:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:32:00.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5477 |
Rev: | 1 |
Start Time: | 2019-12-24 08:45:00.0 |
End Time: | 2019-12-24 08:52:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:25:59.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 5474 |
Rev: | 1 |
Start Time: | 2019-12-24 09:11:00.0 |
End Time: | 2019-12-24 09:18:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:05:52.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5469 |
Rev: | 1 |
Start Time: | 2019-12-26 16:30:00.0 |
End Time: | 2019-12-26 19:30:00.0 |
Satellites: | MET-10 |
Subject: | lunar-eclipse |
Impact: | risk-of-degradation |
Detail: | Moon eclipse. 16:30 to 19:30 UTC image data may be unavailable or incomplete. |
Status: | scheduled |
Issue Time: | 2019-12-18 15:35:28.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5471 |
Rev: | 1 |
Start Time: | 2019-12-26 17:00:00.0 |
End Time: | 2019-12-26 20:00:00.0 |
Satellites: | MET-11 |
Subject: | lunar-eclipse |
Impact: | risk-of-degradation |
Detail: | Moon eclipse. 17:00 to 20:00 UTC image data may be unavailable or incomplete. |
Status: | scheduled |
Issue Time: | 2019-12-18 15:35:43.0 |
Services: |
0M-BM-0 SEVIRI Level 1.5 Image Data 0M-BM-0 Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5472 |
Rev: | 1 |
Start Time: | 2019-12-27 18:17:00.0 |
End Time: | 2019-12-27 19:16:00.0 |
Satellites: | Metop-A |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2019-12-18 15:52:54.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5478 |
Rev: | 1 |
Start Time: | 2019-12-27 19:15:00.0 |
End Time: | 2019-12-27 20:14:00.0 |
Satellites: | Metop-C |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:30:09.0 |
Services: |
GOME-2 Level 1 - Metop-C GOME-2 AHRPT Metop-C AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5476 |
Rev: | 1 |
Start Time: | 2019-12-27 19:44:00.0 |
End Time: | 2019-12-27 20:43:00.0 |
Satellites: | Metop-B |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:19:56.0 |
Services: |
GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5480 |
Rev: | 1 |
Start Time: | 2019-12-31 08:25:00.0 |
End Time: | 2019-12-31 08:32:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:33:50.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5481 |
Rev: | 1 |
Start Time: | 2019-12-31 08:25:00.0 |
End Time: | 2019-12-31 10:08:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:34:45.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5483 |
Rev: | 1 |
Start Time: | 2019-12-31 09:01:00.0 |
End Time: | 2019-12-31 09:08:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:37:39.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5482 |
Rev: | 1 |
Start Time: | 2019-12-31 09:41:00.0 |
End Time: | 2019-12-31 09:48:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:36:44.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 1 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2020-02-17 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:16:48.0 |
Services: |
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5450 |
Rev: | 1 |
Start Time: | 2020-01-06 09:00:00.0 |
End Time: | 2020-02-03 09:00:00.0 |
Satellites: | MET-10 |
Subject: | yearly-RSS-interruption |
Impact: | data-unavailable |
Detail: | Yearly interruption. Meteosat-10 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment maintenance. During this period, there will be no RSS gap filling by Meteosat-9. |
Status: | scheduled |
Issue Time: | 2019-12-11 16:39:52.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5487 |
Rev: | 2 |
Start Time: | 2020-01-06 14:32:00.0 |
End Time: | 2020-01-06 14:39:00.0 |
Satellites: | Metop-B |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression. The exact time will be provided closer to the event. [Rev. 2] Start and End Time Updated. |
Status: | scheduled |
Issue Time: | 2020-01-02 15:11:44.0 |
Services: |
ASCAT Level 1 - Metop-B ASCAT Soil Moisture - Metop-B EARS-ASCAT ASCAT AHRPT Metop-B OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5491 |
Rev: | 2 |
Start Time: | 2020-01-06 15:11:00.0 |
End Time: | 2020-01-06 15:24:00.0 |
Satellites: | Suomi NPP |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre.[Rev.2]: Start and End time updated. |
Status: | scheduled |
Issue Time: | 2020-01-06 16:24:31.0 |
Services: |
CrIS Level 1 - JPSS ATMS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP-JPSS |
Type: | Planned Maintenance |
Ann Nr: | 5492 |
Rev: | 2 |
Start Time: | 2020-01-06 16:02:00.0 |
End Time: | 2020-01-06 16:15:00.0 |
Satellites: | NOAA-20 |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. [Rev.2]: Start and End time updated. |
Status: | scheduled |
Issue Time: | 2020-01-06 16:25:04.0 |
Services: |
ATMS Level 1 - JPSS VIIRS EDR - JPSS CrIS Level 1 - JPSS SNPP-JPSS |
Type: | Planned Maintenance |
Ann Nr: | 5488 |
Rev: | 1 |
Start Time: | 2020-01-07 05:12:00.0 |
End Time: | 2020-01-07 09:12:00.0 |
Satellites: | Metop-B |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | ASCAT External Calibration. Interruptions scheduled at provided times. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:43:44.0 |
Services: |
ASCAT Level 1 - Metop-B ASCAT Soil Moisture - Metop-B EARS-ASCAT ASCAT AHRPT Metop-B OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5484 |
Rev: | 2 |
Start Time: | 2020-01-07 08:55:00.0 |
End Time: | 2020-01-07 09:02:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. The exact time will be provided closer to the event. [Rev. 2] Start and end time updated |
Status: | scheduled |
Issue Time: | 2020-01-02 15:31:57.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 5508 |
Rev: | 1 |
Start Time: | 2020-01-07 09:00:00.0 |
End Time: | 2020-01-07 09:00:00.0 |
Subject: | product-change |
Detail: | Due to a planned calibration change in the ScatSat-1 L1B data from ISRO, the OSI SAF wind products backscatter values will slightly change by 0.35 dB for the HH and VV data, but the wind characteristics will remain the same. |
Status: | scheduled |
Issue Time: | 2020-01-06 16:36:33.0 |
Services: |
OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 5485 |
Rev: | 2 |
Start Time: | 2020-01-07 09:21:00.0 |
End Time: | 2020-01-07 09:28:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. The exact time will be provided closer to the event. [Rev. 2] Start and end time updated. |
Status: | scheduled |
Issue Time: | 2020-01-02 15:33:22.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 5486 |
Rev: | 2 |
Start Time: | 2020-01-07 09:21:00.0 |
End Time: | 2020-01-07 11:04:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. The exact time will be provided closer to the event. [Rev. 2] Start and end time updated. |
Status: | scheduled |
Issue Time: | 2020-01-02 15:34:16.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 5489 |
Rev: | 2 |
Start Time: | 2020-01-07 09:34:00.0 |
End Time: | 2020-01-07 09:41:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. The exact time will be provided closer to the event. [Rev. 2] Start and end time updated |
Status: | scheduled |
Issue Time: | 2020-01-02 15:55:12.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 5493 |
Rev: | 2 |
Start Time: | 2020-01-09 05:30:00.0 |
End Time: | 2020-01-25 07:30:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | Possible McMurdo Critical Maintenance in order to replace some equipment at the ground station. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. Please note that the station might be unavailable only from Monday to Saturday between 05:30 and 07:30 UTC during the maintenance period. [Rev. 2] End Date and time updated. |
Status: | scheduled |
Issue Time: | 2020-01-02 15:37:04.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B AMSU-A Level 1 - Metop-B HIRS Level 1 - Metop-B IASI Level 1 - Metop-B ASCAT Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B GRAS Level 1 - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 5497 |
Rev: | 1 |
Start Time: | 2020-01-10 20:00:00.0 |
End Time: | 2020-01-11 20:00:00.0 |
Subject: | ground-segment-maintenance |
Detail: | Due to Database infrastructure maintenance the EUMETSAT website and some web applications will not be available during the maintenance period. |
Status: | scheduled |
Issue Time: | 2019-12-20 11:15:49.0 |
Services: |
Web Service |
Type: | Planned Maintenance |
Ann Nr: | 5441 |
Rev: | 1 |
Start Time: | 2020-01-13 09:00:00.0 |
End Time: | 2020-01-20 09:00:00.0 |
Satellites: | MET-11 |
Subject: | instrument-decontamination |
Impact: | data-unavailable |
Detail: | SEVIRI decontamination. Meteosat-9 will cover the Full Earth Scan service during the decontamination period. An outage of up to two repeat cycles can be expected when switching to and from Meteosat-9. Meteosat-9 data will also be disseminated on EUMETCast Europe one week before and one week after Meteosat-11 decontamination, i.e. from 06/01 to 27/01/2020. Users wishing to receive the parallel Meteosat data streams on EUMETCast should register with our User Helpdesk (ops@eumetsat.int). For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4762227.html |
Status: | scheduled |
Issue Time: | 2019-12-12 14:46:22.0 |
Services: |
0M-BM-0 SEVIRI Level 1.5 Image Data 0M-BM-0 Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 5490 |
Rev: | 1 |
Start Time: | 2020-01-14 07:00:00.0 |
End Time: | 2020-01-16 13:00:00.0 |
Subject: | ground-segment-maintenance |
Detail: | Internet link migration to a new provider in EARS Athens station. There may be disruption to all Athens acquired EARS services during the indicated times. |
Status: | scheduled |
Issue Time: | 2019-12-18 16:51:41.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-IASI EARS-ASCAT EARS-ATMS EARS-CrlS EARS-VIIRS EARS-VASS EARS-NWC |
Type: | Service Enhancement |
Ann Nr: | 5494 |
Rev: | 1 |
Start Time: | 2020-01-15 09:00:00.0 |
End Time: | 2020-01-15 09:00:00.0 |
Subject: | product-change |
Detail: | Release of a new Processing Baseline, v2.61, for the Sentinel-3 SLSTR products. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4785429.html |
Status: | scheduled |
Issue Time: | 2019-12-19 13:43:54.0 |
Services: |
SLSTR Level 2 Marine Products - S3A SLSTR Level 1 Products - S3A SLSTR Level 1 Products - S3B SLSTR Level 2 Marine Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 5451 |
Rev: | 1 |
Start Time: | 2020-01-21 09:00:00.0 |
End Time: | 2020-01-21 09:00:00.0 |
Subject: | product-change |
Detail: | A new Processing Baseline, PB 2.61, introducing major enhancements to the Sentinel-3 Altimetry products, is planned to be released on 21 January 2020. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4762430.html |
Status: | scheduled |
Issue Time: | 2019-12-11 15:03:16.0 |
Services: |
MWR Level 1 Products - S3A SRAL Level 1 Products - S3A SRAL Level 2 Marine Products - S3A MWR Level 1 Products - S3B SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 5449 |
Rev: | 1 |
Start Time: | 2020-01-27 09:00:00.0 |
End Time: | 2020-02-03 09:00:00.0 |
Satellites: | MET-9 |
Subject: | instrument-decontamination |
Detail: | SEVIRI decontamination. Meteosat-9 will not be available as backup spacecraft for the Full Earth Scan service in the event of Meteosat-11 anomalies. Meteosat-10 will be the backup spacecraft instead. For full details, see the related URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4762227.html |
Status: | scheduled |
Issue Time: | 2019-12-11 14:53:03.0 |
Services: |
0M-BM-0 SEVIRI Level 1.5 Image Data 0M-BM-0 Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 5470 |
Rev: | 1 |
Start Time: | 2020-01-31 16:00:00.0 |
End Time: | 2020-01-31 16:00:00.0 |
Subject: | service-change |
Detail: | NOAA plans to terminate the GOES-15 Imager service on 31 January 2020. The GOES-15 Imager L1b data in netCDF format provided by EUMETSAT will stop being distributed on EUMETCast at the same time. |
Status: | scheduled |
Issue Time: | 2019-12-19 15:19:08.0 |
Services: |
GOES Products |
Type: | Service Enhancement |
Ann Nr: | 5421 |
Rev: | 1 |
Start Time: | 2020-03-02 09:00:00.0 |
End Time: | 2020-03-02 09:00:00.0 |
Subject: | general-announcement |
Detail: | The NOAA Direct Broadcast Real-Time Network (DBRTN) data, currently distributed on EUMETCast, will be removed on 2 March 2020. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/website/home/News/DAT_4759427.html |
Status: | scheduled |
Issue Time: | 2019-12-04 11:30:54.0 |
Services: |
NDB (NOAA Direct Broadcast) |
Type: | Service Enhancement |
Ann Nr: | 5159 |
Rev: | 1 |
Start Time: | 2020-06-01 09:00:00.0 |
End Time: | 2020-06-01 09:00:00.0 |
Subject: | product-change |
Detail: | A new BUFR encoding sequence will be introduced in June 2020 for all EUMETSATM-bM-^@M-^Ys wind products. For full details and sample files, see the URL provided below. |
Url: | http://www.eumetsat.int/website/home/News/DAT_4593260.html |
Status: | scheduled |
Issue Time: | 2019-09-11 16:22:14.0 |
Services: |
0M-BM-0 Meteosat Meteorological Products RSS Meteosat Meteorological Products IODC Meteosat Meteorological Products AVHRR Polar Winds - Metop-A AVHRR Polar Winds - Metop-B AVHRR Polar winds - Metop-C Multi-Metop Wind Products |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |