Topic:M-B Eumetsat Weekly Operations Schedule - Week 3M-B

Date/Time Issued: January 09, 2020 1615Z

Product(s) or Data Impacted:M-B See list below.

Date/Time of Initial Impact:M-B January 09, 2020 1559ZM-B (from the Eumetsat Weekly Operations Schedule message)

Date/Time of Expected End:M-B See table in detail for on and off switch time M-B

Length of Outage:M-B N/A

Details/Specifics of Change:

Message number: M-BM-BM-B 6538
Message creation: M-BM-BM-B Thu Jan 09 15:59:25 GMT+00:00 2020


Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 4920
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2019-06-27 09:00:00.0
End Time: M-BM-BM-B 2019-06-27 09:00:00.0
Subject: M-BM-BM-B general-announcement
Detail: M-BM-BM-B There is an issue with the latest EUMETCast software package, affecting Linux operating systems when the Tellicast client software (version 2.14.5) is used in combination with the Safenet drivers. A new alpha version of Tellicast, with a fix of the issue, is available for download. See the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4451027.html
Issue Time: M-BM-BM-B 2019-06-27 11:18:18.0
Services: M-BM-BM-B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5355
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2019-11-14 00:00:00.0
End Time: M-BM-BM-B 2020-04-15 00:00:00.0
Satellites: M-BM-BM-B Metop-A
Subsystem: M-BM-BM-B GOME-2
Subject: M-BM-BM-B general-announcement
Impact: M-BM-BM-B data-degraded
Detail: M-BM-BM-B The Metop-A satellite with GOME-2 on-board is currently in drifting orbit. As a consequence there are periods during which the GOME-2 instrument is not able to carry out its daily solar calibration measurement. The third such period will be from 14 November 2019 to 14 April 2020. During this period, the solar mean reference spectrum provided in the Metop-A GOME-2 level-1B product will be automatically replaced by a modelled solar spectrum using information on solar activity from Metop-B. Therefore, it is expected that the quality of both level-1B and level-2 products might undergo slight changes during this period, and there will be an associated risk of degraded product quality for Metop-A GOME-2 products.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-27 10:06:36.0
Services: M-BM-BM-B GOME-2 Level 1 - Metop-A
GOME-2 AHRPT Metop-A
AC SAF - Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5402
Rev: M-BM-BM-B 2
Start Time: M-BM-BM-B 2019-12-04 14:00:00.0
End Time: M-BM-BM-B 2020-02-19 14:00:00.0
Satellites: M-BM-BM-B Metop-C
Subject: M-BM-BM-B general-announcement
Impact: M-BM-BM-B data-degraded
Detail: M-BM-BM-B Drift to a new orbital position. During this period, Metop-C will not be following the reference orbit, with a drifting ground track and phase with respect to Metop-B. Some instrument products may be degraded. A small impact on the number and quality of AVHRR wind products might be observed during this period. [Rev. 2]: End date updated.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-27 09:58:40.0
Services: M-BM-BM-B AVHRR Level 1 - Metop-C
SEM L0 - Metop-C
AMSU-A Level 1 - Metop-C
IASI Sounding products- Metop-C
MHS Level 1 - Metop-C
IASI Level 1 - Metop-C
Multi-sensor Products - Metop-C
EARS-ATOVS
EARS-AVHRR
EARS-IASI
A-DCS AHRPT Metop-C
AMSU-A AHRPT Metop-C
HIRS AHRPT Metop-C
AVHRR AHRPT Metop-C
IASI AHRPT Metop-C
SEM AHRPT Metop-C
MHS AHRPT Metop-C

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5467
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2019-12-19 09:00:00.0
End Time: M-BM-BM-B 2019-12-19 09:00:00.0
Subject: M-BM-BM-B general-announcement
Detail: M-BM-BM-B Sentinel-3A and -3B OLCI orbit prediction files for 2020 will be made available successively between now and end of January 2020. For full details, see the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4777627.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-18 15:21:29.0
Services: M-BM-BM-B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5475
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-06 00:00:00.0
End Time: M-BM-BM-B 2020-02-17 00:00:00.0
Satellites: M-BM-BM-B Metop-A
Subsystem: M-BM-BM-B ASCAT
Subject: M-BM-BM-B general-announcement
Impact: M-BM-BM-B risk-of-interruption
Detail: M-BM-BM-B Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-18 16:16:48.0
Services: M-BM-BM-B ASCAT Level 1 - Metop-A
ASCAT Soil Moisture - Metop-A

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5450
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-06 09:00:00.0
End Time: M-BM-BM-B 2020-02-03 09:00:00.0
Satellites: M-BM-BM-B MET-10
Subject: M-BM-BM-B yearly-RSS-interruption
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B Yearly interruption. Meteosat-10 Rapid Scanning Service (RSS) will be suspended for scheduled Full Earth Scanning and Ground Segment maintenance. During this period, there will be no RSS gap filling by Meteosat-9.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-11 16:39:52.0
Services: M-BM-BM-B RSS SEVIRI Level 1.5 Image Data
RSS Meteosat Meteorological Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5493
Rev: M-BM-BM-B 2
Start Time: M-BM-BM-B 2020-01-09 05:30:00.0
End Time: M-BM-BM-B 2020-01-25 07:30:00.0
Satellites: M-BM-BM-B Metop-B
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B data-delayed
Detail: M-BM-BM-B Possible McMurdo Critical Maintenance in order to replace some equipment at the ground station. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period. Please note that the station might be unavailable only from Monday to Saturday between 05:30 and 07:30 UTC during the maintenance period. [Rev. 2] End Date and time updated.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-02 15:37:04.0
Services: M-BM-BM-B SEM L0 - Metop-B
AVHRR Level 1 - Metop-B
MHS Level 1 - Metop-B
AMSU-A Level 1 - Metop-B
HIRS Level 1 - Metop-B
IASI Level 1 - Metop-B
ASCAT Level 1 - Metop-B
GOME-2 Level 1 - Metop-B
ATOVS Sounding products - Metop-B
GRAS Level 1 - Metop-B
IASI Sounding Products - Metop-B
ASCAT Soil Moisture - Metop-B
AVHRR Polar Winds - Metop-B
Multi-Sensor Products - Metop-B
Multi-Metop Wind Products

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5529
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-09 09:00:00.0
End Time: M-BM-BM-B 2020-01-09 09:00:00.0
Subject: M-BM-BM-B new-service
Detail: M-BM-BM-B EUMETSAT launches a new pilot data service, the Data Tailor. The Data Tailor makes it possible for users to subset and aggregate data products in space and time, filter layers, generate quicklooks, project onto new coordinate reference systems, and reformat into common GIS formats. It offers a uniform way to transform both historical and near real-time satellite data provided by EUMETSAT. For full details, see the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4789827.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-09 13:30:37.0
Services: M-BM-BM-B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5497
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-10 20:00:00.0
End Time: M-BM-BM-B 2020-01-11 20:00:00.0
Subject: M-BM-BM-B ground-segment-maintenance
Detail: M-BM-BM-B Due to Database infrastructure maintenance the EUMETSAT website and some web applications will not be available during the maintenance period.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-20 11:15:49.0
Services: M-BM-BM-B Web Service

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5512
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-13 08:00:00.0
End Time: M-BM-BM-B 2020-01-13 17:00:00.0
Satellites: M-BM-BM-B Sentinel-3A, Sentinel-3B
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B risk-of-interruption
Detail: M-BM-BM-B
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 14:13:55.0
Services: M-BM-BM-B OLCI Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3A
OLCI Level 1 Products - S3A
SLSTR Level 2 Marine Products - S3A
SRAL Level 1 Products - S3A
SRAL Level 2 Marine Products - S3A
OLCI Level 1 Products - S3B
OLCI Level 2 Marine Products - S3B
SLSTR Level 1 Products - S3B
SLSTR Level 2 Marine Products - S3B
SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5441
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-13 09:00:00.0
End Time: M-BM-BM-B 2020-01-20 09:00:00.0
Satellites: M-BM-BM-B MET-11
Subject: M-BM-BM-B instrument-decontamination
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B SEVIRI decontamination. Meteosat-9 will cover the Full Earth Scan service during the decontamination period. An outage of up to two repeat cycles can be expected when switching to and from Meteosat-9. Meteosat-9 data will also be disseminated on EUMETCast Europe one week before and one week after Meteosat-11 decontamination, i.e. from 06/01 to 27/01/2020. Users wishing to receive the parallel Meteosat data streams on EUMETCast should register with our User Helpdesk (ops@eumetsat.int). For full details, see the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4762227.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-12 14:46:22.0
Services: M-BM-BM-B 0M-BM-0 SEVIRI Level 1.5 Image Data
0M-BM-0 Meteosat Meteorological Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5523
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-13 11:35:00.0
End Time: M-BM-BM-B 2020-01-14 07:01:00.0
Satellites: M-BM-BM-B Metop-A
Subsystem: M-BM-BM-B IASI
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B IASI External Calibration (Moon Intrusion). Short interruptions can be expected.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:52:50.0
Services: M-BM-BM-B IASI Level 1 - Metop-A
IASI Sounding Products - Metop-A
EARS-IASI
IASI AHRPT Metop-A
OSI SAF - Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5521
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-13 14:46:00.0
End Time: M-BM-BM-B 2020-01-13 14:52:00.0
Satellites: M-BM-BM-B Metop-C
Subsystem: M-BM-BM-B ASCAT
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B Gain Compression
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:41:40.0
Services: M-BM-BM-B ASCAT Soil Moisture - Metop-C
ASCAT Level 1 - Metop-C
EARS-ASCAT
ASCAT AHRPT Metop-C
OSI SAF - Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5524
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-13 22:48:00.0
End Time: M-BM-BM-B 2020-01-14 23:37:00.0
Satellites: M-BM-BM-B Metop-B
Subsystem: M-BM-BM-B IASI
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B IASI External Calibration (Moon Intrusion). Short interruptions can be expected.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:54:00.0
Services: M-BM-BM-B IASI Sounding Products - Metop-B
IASI Level 1 - Metop-B
EARS-IASI
OSI SAF - Products
IASI AHRPT Metop-B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5525
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-13 23:55:00.0
End Time: M-BM-BM-B 2020-01-15 00:43:00.0
Satellites: M-BM-BM-B Metop-C
Subsystem: M-BM-BM-B IASI
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B IASI External Calibration (Moon Intrusion). Short interruptions can be expected.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:56:09.0
Services: M-BM-BM-B IASI Level 1 - Metop-C
IASI Sounding products- Metop-C
EARS-IASI
IASI AHRPT Metop-C
OSI SAF - Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5514
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 05:13:00.0
End Time: M-BM-BM-B 2020-01-14 05:14:00.0
Satellites: M-BM-BM-B MET-8
Subject: M-BM-BM-B in-plane-manoeuvre
Impact: M-BM-BM-B data-degraded
Detail: M-BM-BM-B East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:32:53.0
Services: M-BM-BM-B IODC SEVIRI Level 1.5 Image Data
IODC Meteosat Meteorological Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5490
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 07:00:00.0
End Time: M-BM-BM-B 2020-01-16 13:00:00.0
Subject: M-BM-BM-B ground-segment-maintenance
Detail: M-BM-BM-B Internet link migration to a new provider in EARS Athens station. There may be disruption to all Athens acquired EARS services during the indicated times.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-18 16:51:41.0
Services: M-BM-BM-B EARS-ATOVS
EARS-AVHRR
EARS-IASI
EARS-ASCAT
EARS-ATMS
EARS-CrlS
EARS-VIIRS
EARS-VASS
EARS-NWC

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5517
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 08:10:00.0
End Time: M-BM-BM-B 2020-01-14 08:17:00.0
Satellites: M-BM-BM-B Metop-B
Subsystem: M-BM-BM-B SEM
Component: M-BM-BM-B MEPED
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B SEM MEPED in flight calibration.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:36:50.0
Services: M-BM-BM-B SEM L0 - Metop-B
SEM AHRPT Metop-B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5516
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 08:36:00.0
End Time: M-BM-BM-B 2020-01-14 08:43:00.0
Satellites: M-BM-BM-B Metop-A
Subsystem: M-BM-BM-B SEM
Component: M-BM-BM-B MEPED
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B SEM MEPED in flight calibration.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:35:58.0
Services: M-BM-BM-B SEM L0 - Metop-A
SEM AHRPT Metop-A

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5526
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 09:00:00.0
End Time: M-BM-BM-B 2020-01-14 11:00:00.0
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B risk-of-interruption
Detail: M-BM-BM-B Internet provider change in Eumetsat. Some internet-based applications might be unavailable during the maintenance period. All data transfers to/from Eumetsat might be interrupted during the maintenance period.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 16:37:58.0
Services: M-BM-BM-B Web Service

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5518
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 09:08:00.0
End Time: M-BM-BM-B 2020-01-14 09:15:00.0
Satellites: M-BM-BM-B Metop-C
Subsystem: M-BM-BM-B SEM
Component: M-BM-BM-B MEPED
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B SEM MEPED in flight calibration.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:37:54.0
Services: M-BM-BM-B SEM L0 - Metop-C
SEM AHRPT Metop-C

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5519
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-14 09:08:00.0
End Time: M-BM-BM-B 2020-01-14 10:51:00.0
Satellites: M-BM-BM-B Metop-C
Subsystem: M-BM-BM-B SEM
Component: M-BM-BM-B TED
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B SEM TED in flight calibration.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:38:36.0
Services: M-BM-BM-B SEM L0 - Metop-C
SEM AHRPT Metop-C

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5520
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-15 05:12:00.0
End Time: M-BM-BM-B 2020-01-15 09:12:00.0
Satellites: M-BM-BM-B Metop-C
Subsystem: M-BM-BM-B IASI
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B External Calibration
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:40:34.0
Services: M-BM-BM-B IASI Sounding products- Metop-C
IASI Level 1 - Metop-C
EARS-IASI
IASI AHRPT Metop-C
OSI SAF - Products

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5494
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-15 09:00:00.0
End Time: M-BM-BM-B 2020-01-15 09:00:00.0
Subject: M-BM-BM-B product-change
Detail: M-BM-BM-B Release of a new Processing Baseline, v2.61, for the Sentinel-3 SLSTR products. For full details, see the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4785429.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-19 13:43:54.0
Services: M-BM-BM-B SLSTR Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3A
SLSTR Level 1 Products - S3B
SLSTR Level 2 Marine Products - S3B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5513
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-16 08:00:00.0
End Time: M-BM-BM-B 2020-01-16 17:00:00.0
Satellites: M-BM-BM-B Sentinel-3A, Sentinel-3B
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B risk-of-interruption
Detail: M-BM-BM-B
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 14:15:58.0
Services: M-BM-BM-B OLCI Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3A
SLSTR Level 2 Marine Products - S3A
OLCI Level 1 Products - S3A
SRAL Level 2 Marine Products - S3A
SRAL Level 1 Products - S3A
OLCI Level 1 Products - S3B
SLSTR Level 1 Products - S3B
OLCI Level 2 Marine Products - S3B
SLSTR Level 2 Marine Products - S3B
SRAL Level 1 Products - S3B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5527
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-16 09:00:00.0
End Time: M-BM-BM-B 2020-01-16 09:00:00.0
Satellites: M-BM-BM-B Suomi NPP,NOAA-20
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B risk-of-interruption
Detail: M-BM-BM-B SNPP and NOAA-20 CrIS calibration changes. These will have impacts of up to 0.05 K, 0.1 K and 0.2 K in the LW, MW and SW bands, respectively (depending on scene temperature; impacts will be largest for cold scenes in the SW band). The changes will bring CrIS into better agreement with IASI, reduce inter-FOV variability, and improve the agreement between SNPP and NOAA-20 (changes will be larger for SNPP CrIS). The exact time will be provided closer to the maintenance.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 16:35:12.0
Services: M-BM-BM-B CrlS Level 1 - Suomi-NPP
CrIS Level 1 - JPSS
EARS-CrlS

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5515
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-19 04:50:00.0
End Time: M-BM-BM-B 2020-01-19 09:50:00.0
Satellites: M-BM-BM-B Metop-A
Subsystem: M-BM-BM-B IASI
Subject: M-BM-BM-B instrument-calibration
Impact: M-BM-BM-B data-unavailable
Detail: M-BM-BM-B External Calibration
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:34:15.0
Services: M-BM-BM-B IASI Sounding Products - Metop-A
IASI Level 1 - Metop-A
EARS-IASI
IASI AHRPT Metop-A
OSI SAF - Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5528
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-19 09:00:00.0
End Time: M-BM-BM-B 2020-01-19 17:00:00.0
Subject: M-BM-BM-B ground-segment-maintenance
Impact: M-BM-BM-B risk-of-interruption
Detail: M-BM-BM-B Major Telephone system maintenance. All Telephones might be unavailable during the maintenance period. Eumetsat will be reachable only via the following Telephone numbers: Direct EPS: +49 (6151) 8704081. Direct MSG: +49 (6151) 8704131. Direct S3: +49 (6151) 3974840. Direct Security: +49 (6151) 8704066
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 16:44:51.0
Services: M-BM-BM-B

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5451
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-21 09:00:00.0
End Time: M-BM-BM-B 2020-01-21 09:00:00.0
Subject: M-BM-BM-B product-change
Detail: M-BM-BM-B A new Processing Baseline, PB 2.61, introducing major enhancements to the Sentinel-3 Altimetry products, is planned to be released on 21 January 2020. For full details, see the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4762430.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-11 15:03:16.0
Services: M-BM-BM-B MWR Level 1 Products - S3A
SRAL Level 1 Products - S3A
SRAL Level 2 Marine Products - S3A
MWR Level 1 Products - S3B
SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5449
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-27 09:00:00.0
End Time: M-BM-BM-B 2020-02-03 09:00:00.0
Satellites: M-BM-BM-B MET-9
Subject: M-BM-BM-B instrument-decontamination
Detail: M-BM-BM-B SEVIRI decontamination. Meteosat-9 will not be available as backup spacecraft for the Full Earth Scan service in the event of Meteosat-11 anomalies. Meteosat-10 will be the backup spacecraft instead. For full details, see the related URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4762227.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-11 14:53:03.0
Services: M-BM-BM-B 0M-BM-0 SEVIRI Level 1.5 Image Data
0M-BM-0 Meteosat Meteorological Products

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5470
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-01-31 16:00:00.0
End Time: M-BM-BM-B 2020-01-31 16:00:00.0
Subject: M-BM-BM-B service-change
Detail: M-BM-BM-B NOAA plans to terminate the GOES-15 Imager service on 31 January 2020. The GOES-15 Imager L1b data in netCDF format provided by EUMETSAT will stop being distributed on EUMETCast at the same time.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-19 15:19:08.0
Services: M-BM-BM-B GOES Products

Type: M-BM-BM-B Planned Maintenance
Ann Nr: M-BM-BM-B 5522
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-02-05 09:00:00.0
End Time: M-BM-BM-B 2020-02-05 09:00:00.0
Satellites: M-BM-BM-B Metop-C
Subject: M-BM-BM-B in-plane-manoeuvre
Impact: M-BM-BM-B data-degraded
Detail: M-BM-BM-B Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre.
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2020-01-08 15:44:26.0
Services: M-BM-BM-B SEM L0 - Metop-C
AMSU-A Level 1 - Metop-C
AVHRR Level 1 - Metop-C
MHS Level 1 - Metop-C
GRAS Level 1 - Metop-C
IASI Level 1 - Metop-C
GOME-2 Level 1 - Metop-C
ASCAT Level 1 - Metop-C
A-DCS AHRPT Metop-C
AMSU-A AHRPT Metop-C
AVHRR AHRPT Metop-C
ASCAT AHRPT Metop-C
GOME-2 AHRPT Metop-C
GRAS AHRPT Metop-C
HIRS AHRPT Metop-C
IASI AHRPT Metop-C
MHS AHRPT Metop-C
SEM AHRPT Metop-C

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5421
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-03-02 09:00:00.0
End Time: M-BM-BM-B 2020-03-02 09:00:00.0
Subject: M-BM-BM-B general-announcement
Detail: M-BM-BM-B The NOAA Direct Broadcast Real-Time Network (DBRTN) data, currently distributed on EUMETCast, will be removed on 2 March 2020. For full details, see the URL provided below.
Url: M-BM-BM-B https://www.eumetsat.int/website/home/News/DAT_4759427.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-12-04 11:30:54.0
Services: M-BM-BM-B NDB (NOAA Direct Broadcast)

Type: M-BM-BM-B Service Enhancement
Ann Nr: M-BM-BM-B 5159
Rev: M-BM-BM-B 1
Start Time: M-BM-BM-B 2020-06-01 09:00:00.0
End Time: M-BM-BM-B 2020-06-01 09:00:00.0
Subject: M-BM-BM-B product-change
Detail: M-BM-BM-B A new BUFR encoding sequence will be introduced in June 2020 for all EUMETSATM-bM-^@M-^Ys wind products. For full details and sample files, see the URL provided below.
Url: M-BM-BM-B http://www.eumetsat.int/website/home/News/DAT_4593260.html
Status: M-BM-BM-B scheduled
Issue Time: M-BM-BM-B 2019-09-11 16:22:14.0
Services: M-BM-BM-B 0M-BM-0 Meteosat Meteorological Products
RSS Meteosat Meteorological Products
IODC Meteosat Meteorological Products
AVHRR Polar Winds - Metop-A
AVHRR Polar Winds - Metop-B
AVHRR Polar winds - Metop-C
Multi-Metop Wind Products

Name: M-BM-BM-B EUMETSAT
Address: M-BM-BM-B Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: M-BM-BM-B +49 6151 807 3660/3770
Fax: M-BM-BM-B +49 6151 807 3790
E-mail: M-BM-BM-B ops@eumetsat.int
Internet: M-BM-BM-B www.eumetsat.int

You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).

Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.