Update #1: Due to a networking issue, Calibration is postpone until October 15, 2020 1400Z and will now end October 16, 2020 1600Z


Topic: GOES-16 SEISS MPS-LO Electron and Ion Microchannel Plate (MCP) HV Bias Calibration (impacts SEISS)


Date/Time Issued: October 14, 2020 1522Z


Product(s) or Data Impacted: GOES-16 SEISS MPS-LO


Date/Time of Initial Impact: October 14, 2020 1400Z


Date/Time of Expected End: October 15, 2020 1600Z


Length of Outage: 26 hours of product degradation


Details/Specifics of Change:


A GOES-16 (GOES-EAST) SEISS MPS-LO Electron and Ion Microchannel Plate (MCP) HV Bias Calibration will be performed from 2020/288T14:00z to 2020/289T16:00z. The calibration will consist of 2 hours of commanding followed by a 24 hour power off of the MPS-LO Deflection Electrode High Voltage (required for performance data collection). SEISS MPS-LO will experience data degradation during this 26 hour period until the Deflection Electrode High Voltage is powered back on returning the sensor to nominal operation.


The SEISS MPS-LO Calibration will be cancelled due to CWD or if the Space Weather environment is not appropriate for the calibration.


Contact Information for Further Information: ESPC Operations at ESPCOperations@noaa.gov or 301-817-3880

                                                                            GOES Payload Engineering: 301-817-4409

Web Site(s) for applicable information: N/A


This message was sent by ESPC.Notification@noaa.gov. You have been sent this and other notifications because you have opted in to receive
it. If for any reason, you wish to unsubscribe, please contact ESPC Help Desk at ESPCOperations@noaa.gov or (301) 817-3880. Please note:
it may take up to two business days to process your unsubscribe request.