Topic:  Eumetsat Weekly Operations Schedule, Week 16

Date/Time Issued: April 09, 2020  1440Z


Product(s) or Data Impacted:  See list below.


Date/Time of Initial Impact:  April 09, 2020  1415Z (from the Eumetsat Weekly Operations Schedule message)


Date/Time of Expected End:  See table in detail for on and off switch time 

 

Length of Outage:  N/A


Details/Specifics of Change:

.
Message number: 6795
Message creation: Thu Apr 09 14:15:03 UTC 2020


Type: Service Enhancement
Ann Nr: 4920
Rev: 1
Start Time: 2019-06-27 09:00:00.0
End Time: 2019-06-27 09:00:00.0
Subject: general-announcement
Detail: There is an issue with the latest EUMETCast software package, affecting Linux operating systems when the Tellicast client software (version 2.14.5) is used in combination with the Safenet drivers. A new alpha version of Tellicast, with a fix of the issue, is available for download. See the URL provided below.
Url: https://www.eumetsat.int/website/home/News/DAT_4451027.html
Issue Time: 2019-06-27 11:18:18.0
Services:

Type: Planned Maintenance
Ann Nr: 5355
Rev: 1
Start Time: 2019-11-14 00:00:00.0
End Time: 2020-04-15 00:00:00.0
Satellites: Metop-A
Subsystem: GOME-2
Subject: general-announcement
Impact: data-degraded
Detail: The Metop-A satellite with GOME-2 on-board is currently in drifting orbit. As a consequence there are periods during which the GOME-2 instrument is not able to carry out its daily solar calibration measurement. The third such period will be from 14 November 2019 to 14 April 2020. During this period, the solar mean reference spectrum provided in the Metop-A GOME-2 level-1B product will be automatically replaced by a modelled solar spectrum using information on solar activity from Metop-B. Therefore, it is expected that the quality of both level-1B and level-2 products might undergo slight changes during this period, and there will be an associated risk of degraded product quality for Metop-A GOME-2 products.
Status: scheduled
Issue Time: 2020-01-10 07:39:08.0
Services: GOME-2 Level 1 - Metop-A
GOME-2 AHRPT Metop-A
AC SAF - Products

Type: Planned Maintenance
Ann Nr: 5475
Rev: 5
Start Time: 2020-01-06 00:00:00.0
End Time: 2020-06-29 00:00:00.0
Satellites: Metop-A
Subsystem: ASCAT
Subject: general-announcement
Impact: risk-of-interruption
Detail: Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated.
Status: scheduled
Issue Time: 2020-04-09 06:53:06.0
Services: ASCAT Soil Moisture - Metop-A
ASCAT Level 1 - Metop-A

Type: Planned Maintenance
Ann Nr: 5596
Rev: 1
Start Time: 2020-01-29 00:00:00.0
End Time: 2021-12-31 23:59:00.0
Satellites: Metop-A
Subsystem: HRPT
Subject: general-announcement
Impact: data-unavailable
Detail: HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates.
Status: scheduled
Issue Time: 2020-02-03 10:12:03.0
Services: A-DCS AHRPT Metop-A
ASCAT AHRPT Metop-A
AMSU-A AHRPT Metop-A
AVHRR AHRPT Metop-A
IASI AHRPT Metop-A
HIRS AHRPT Metop-A
GRAS AHRPT Metop-A
MHS AHRPT Metop-A
GOME-2 AHRPT Metop-A
SEM AHRPT Metop-A

Type: Planned Maintenance
Ann Nr: 5574
Rev: 4
Start Time: 2020-04-07 09:00:00.0
End Time: 2020-04-07 17:00:00.0
Satellites: Metop-A,Metop-B,Metop-C
Subsystem: GRAS
Subject: ground-segment-maintenance
Impact: risk-of-interruption
Detail: Software Release of GRAS PPF. Changes to the GRAS Level 1 product algorithms. The algorithm changes include technical improvements and bug fixes, as well as support to the changed data formats of the auxiliary files provided by the Radio Occultation Support Network (RSN). This message refers to the second phase of the deployment which will use the changed RSN auxiliary files (after a first phase planned to take place on 04 February 2020). [Rev. 2] The second phase of the deployment will no longer take place on 12 February 2020, it is postponed to a future date. [Rev. 3] The second phase of the deployment using the changed RSN auxiliary files is further postponed to 7th April 2020. [Rev 4]: The deployment is postponed to a future date.
Status: scheduled
Issue Time: 2020-03-24 13:50:33.0
Services: GRAS Level 1 - Metop-A
GRAS Level 1 - Metop-B
GRAS Level 1 - Metop-C

Type: Planned Maintenance
Ann Nr: 5743
Rev: 1
Start Time: 2020-04-09 06:00:00.0
End Time: 2020-05-01 12:00:00.0
Satellites: GOES17
Subject: instrument-special-operation
Impact: risk-of-interruption
Detail: NOAA will conduct a GOES-West ABI Cooling Timeline test from 9th of April – 1st of May every day between 06:00 to 12:00 UTC. During this test phase, GOES-17 operations mode will change from MODE 6 to MODE 3, and this will affect the GOES-West ABI Level 1B data distribution on EUMETCast. For full details, see the URL provided below. There is a risk of missing or degraded data during this time period.
Url: https://www.eumetsat.int/website/home/News/DAT_4930965.html
Status: scheduled
Issue Time: 2020-03-19 10:22:14.0
Services: GOES Products

Type: Planned Maintenance
Ann Nr: 5807
Rev: 1
Start Time: 2020-04-13 14:31:00.0
End Time: 2020-04-13 14:38:00.0
Satellites: Metop-A
Subsystem: ASCAT
Subject: instrument-calibration
Impact: data-unavailable
Detail: Gain Compression
Status: scheduled
Issue Time: 2020-04-08 14:09:39.0
Services: ASCAT Level 1 - Metop-A
ASCAT Soil Moisture - Metop-A
EARS-ASCAT
ASCAT AHRPT Metop-A
OSI SAF - Products

Type: Planned Maintenance
Ann Nr: 5806
Rev: 1
Start Time: 2020-04-14 04:50:00.0
End Time: 2020-04-14 08:50:00.0
Satellites: Metop-A
Subsystem: IASI
Subject: instrument-calibration
Impact: data-unavailable
Detail: External Calibration
Status: scheduled
Issue Time: 2020-04-08 14:07:49.0
Services: IASI Level 1 - Metop-A
IASI Sounding Products - Metop-A
EARS-IASI
IASI AHRPT Metop-A
OSI SAF - Products

Type: Planned Maintenance
Ann Nr: 5804
Rev: 1
Start Time: 2020-04-14 08:28:00.0
End Time: 2020-04-14 08:35:00.0
Satellites: Metop-B
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2020-04-08 14:05:29.0
Services: SEM L0 - Metop-B
SEM AHRPT Metop-B

Type: Planned Maintenance
Ann Nr: 5802
Rev: 1
Start Time: 2020-04-14 08:54:00.0
End Time: 2020-04-14 09:01:00.0
Satellites: Metop-A
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2020-04-08 14:03:40.0
Services: SEM L0 - Metop-A
SEM AHRPT Metop-A

Type: Planned Maintenance
Ann Nr: 5803
Rev: 1
Start Time: 2020-04-14 08:54:00.0
End Time: 2020-04-14 10:37:00.0
Satellites: Metop-A
Subsystem: SEM
Component: TED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM TED in flight calibration.
Status: scheduled
Issue Time: 2020-04-08 14:04:37.0
Services: SEM L0 - Metop-A
SEM AHRPT Metop-A

Type: Planned Maintenance
Ann Nr: 5805
Rev: 1
Start Time: 2020-04-14 09:21:00.0
End Time: 2020-04-14 09:28:00.0
Satellites: Metop-C
Subsystem: SEM
Component: MEPED
Subject: instrument-calibration
Impact: data-unavailable
Detail: SEM MEPED in flight calibration.
Status: scheduled
Issue Time: 2020-04-08 14:06:30.0
Services: SEM L0 - Metop-C
SEM AHRPT Metop-C

Type: Planned Maintenance
Ann Nr: 5800
Rev: 1
Start Time: 2020-04-15 05:58:00.0
End Time: 2020-04-15 05:59:00.0
Satellites: MET-8
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre.
Status: scheduled
Issue Time: 2020-04-08 13:59:34.0
Services: IODC SEVIRI Level 1.5 Image Data
IODC Meteosat Meteorological Products

Type: Planned Maintenance
Ann Nr: 5799
Rev: 1
Start Time: 2020-04-15 07:30:00.0
End Time: 2020-04-15 17:30:00.0
Satellites: Sentinel-3A,Sentinel-3B
Subject: ground-segment-maintenance
Impact: risk-of-delay
Detail: Copernicus Online Data Access (CODA) users might experience delays or short interruptions whilst accessing products.
Status: scheduled
Issue Time: 2020-04-08 11:02:09.0
Services: OLCI Level 1 Products - S3A
SLSTR Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3A
OLCI Level 2 Marine Products - S3A
SRAL Level 2 Marine Products - S3A
SRAL Level 1 Products - S3A
SRAL L2P Marine Products - S3A
OLCI Level 1 Products - S3B
OLCI Level 2 Marine Products - S3B
SLSTR Level 1 Products - S3B
SLSTR Level 2 Marine Products - S3B
SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B

Type: Service Enhancement
Ann Nr: 5664
Rev: 1
Start Time: 2020-04-15 09:00:00.0
End Time: 2020-04-15 09:00:00.0
Subject: general-announcement
Detail: The EUMETCast channels on which SNPP CrIS and ATMS global and regional data are distributed will change on 15/04/2020. There will be a period of 3 weeks (from 26/03 to 15/04/2020) during which the data will be distributed in parallel on the current channels and the new channels. For full details, see the URL provided below.
Url: https://www.eumetsat.int/website/home/News/DAT_4880881.html
Status: scheduled
Issue Time: 2020-02-19 14:24:49.0
Services: CrlS Level 1 - Suomi-NPP
ATMS Level 1 - Suomi-NPP
EARS-ATMS
EARS-CrlS

Type: Planned Maintenance
Ann Nr: 5801
Rev: 1
Start Time: 2020-04-15 09:58:00.0
End Time: 2020-04-15 09:59:00.0
Satellites: MET-10
Subject: in-plane-manoeuvre
Impact: data-degraded
Detail: East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre.
Status: scheduled
Issue Time: 2020-04-08 14:00:24.0
Services: RSS Meteosat Meteorological Products
RSS SEVIRI Level 1.5 Image Data

Type: Planned Maintenance
Ann Nr: 5791
Rev: 2
Start Time: 2020-04-16 08:00:00.0
End Time: 2020-04-16 11:00:00.0
Satellites: Metop-A
Subsystem: GOME-2
Subject: ground-segment-maintenance
Impact: risk-of-degradation
Detail: GOME-2 Level 1B product - switch back to daily solar irradiance measurements. The GOME-2 Level 1B processing will switch back from the solar model to the use of daily solar irradiance measurements. A small impact on Level 2 product quality is possible. [Rev. 2] Details updated.
Status: scheduled
Issue Time: 2020-04-09 06:48:30.0
Services: GOME-2 Level 1 - Metop-A

Type: Service Enhancement
Ann Nr: 5798
Rev: 1
Start Time: 2020-04-16 09:00:00.0
End Time: 2020-04-16 09:00:00.0
Subject: product-change
Detail: Update to Sentinel-3B OLCI L1 Processing Baseline, bringing improvements in OLCI-B geometric calibration, particularly in the along-track bias and at the camera edges in the across-track direction (especially at the camera 1 and 2 interfaces).
Status: scheduled
Issue Time: 2020-04-08 10:22:55.0
Services: OLCI Level 1 Products - S3B

Type: Planned Maintenance
Ann Nr: 5758
Rev: 2
Start Time: 2020-04-19 09:00:00.0
End Time: 2020-08-02 00:00:00.0
Satellites: Metop-A
Subsystem: GOME-2
Subject: instrument-calibration
Impact: data-degraded
Detail: During the indicated period, GOME on Metop-A will perform sun calibrations with an increased frequency alternating clockwise and counter-clockwise rotation of the scanning unit. Data disruptions are not expected but possible. [Rev. 2] End Date/Time updated.
Status: scheduled
Issue Time: 2020-04-03 06:47:20.0
Services: GOME-2 Level 1 - Metop-A
GOME-2 AHRPT Metop-A

Type: Service Enhancement
Ann Nr: 5762
Rev: 1
Start Time: 2020-04-19 09:00:00.0
End Time: 2020-08-15 09:00:00.0
Satellites: Metop-A
Subject: general-announcement
Impact: risk-of-interruption
Detail: Metop-A Technology Test Campaign II (two) execution: possible data disruptions or outages. More information will be given in specific instruments announcements. [Rev. 2] End date/time updated.
Status: scheduled
Issue Time: 2020-04-02 15:06:03.0
Services:

Type: Service Enhancement
Ann Nr: 5699
Rev: 1
Start Time: 2020-04-22 09:00:00.0
End Time: 2020-04-22 09:00:00.0
Subject: product-change
Detail: SNPP CrIS Sensor Data Records (SDRs) will switch to full spectral resolution (FSR) mode on 22/04/2020. This change will affect both the global and regional data. On the same date, the distribution of SNPP CrIS SDRs in the current nominal spectral resolution (NSR) mode will be stopped. For full details and for sample SNPP CrIS FSR data, see the URL provided below.
Url: https://www.eumetsat.int/website/home/News/DAT_4901893.html
Status: scheduled
Issue Time: 2020-02-28 12:51:04.0
Services: CrlS Level 1 - Suomi-NPP
EARS-CrlS

Type: Service Enhancement
Ann Nr: 5781
Rev: 1
Start Time: 2020-04-22 09:00:00.0
End Time: 2020-04-22 09:00:00.0
Subject: product-change
Detail: Update to EARS-IASI L2 processing. The configuration of the processing chain for Metop-A has been updated after the irrecoverable degradation of Metop-A/MHS channel 2. This channel is now discarded from the combined microwave-infrared retrieval to recover the product yield and quality from Metop-A. This is implemented in the latest patch of the IASI L2 version 6.5, also deployed in the global processing. The update also involves small changes to the product format. For sample files of the updated EARS-IASI L2 data, please see the FTP link provided below.
Url: ftp://ftp.eumetsat.int/pub/OPS/out/test-data/Test-data-for-External-Users/EARS-IASI-L2_V6.5/
Status: scheduled
Issue Time: 2020-04-01 12:34:44.0
Services: EARS-IASI

Type: Service Enhancement
Ann Nr: 5797
Rev: 1
Start Time: 2020-05-27 09:00:00.0
End Time: 2020-05-27 09:00:00.0
Subject: product-change
Detail: Change to SNPP VIIRS AMV BUFR encoding sequence. For full details and sample files using the new BUFR sequence, see the URL provided below.
Url: https://www.eumetsat.int/website/home/News/DAT_4939421.html
Status: scheduled
Issue Time: 2020-04-08 12:12:35.0
Services: VIIRS EDR - Suomi-NPP

Type: Service Enhancement
Ann Nr: 5159
Rev: 1
Start Time: 2020-06-01 09:00:00.0
End Time: 2020-06-01 09:00:00.0
Subject: product-change
Detail: A new BUFR encoding sequence will be introduced in June 2020 for all EUMETSAT’s wind products. For full details and sample files, see the URL provided below.
Url: http://www.eumetsat.int/website/home/News/DAT_4593260.html
Status: scheduled
Issue Time: 2019-09-11 16:22:14.0
Services: 0° Meteosat Meteorological Products
RSS Meteosat Meteorological Products
IODC Meteosat Meteorological Products
AVHRR Polar Winds - Metop-A
AVHRR Polar Winds - Metop-B
AVHRR Polar winds - Metop-C
Multi-Metop Wind Products

Name: EUMETSAT
Address: Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone: +49 6151 807 3660/3770
Fax: +49 6151 807 3790
E-mail: ops@eumetsat.int
Internet: www.eumetsat.int

You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).

Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.