Message number: | 7728 |
Message creation: | Mon Mar 08 15:17:57 UTC 2021 |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 10 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2021-04-01 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated. |
Status: | scheduled |
Issue Time: | 2020-11-27 12:17:02.0 |
Services: |
ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 1 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-12-31 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. |
Status: | scheduled |
Issue Time: | 2020-02-03 10:12:03.0 |
Services: |
A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 6259 |
Rev: | 1 |
Start Time: | 2020-09-15 00:00:00.0 |
End Time: | 2021-05-15 00:00:00.0 |
Satellites: | NOAA-15,NOAA-19 |
Subsystem: | AVHRR |
Subject: | general-announcement |
Detail: | NESDIS Office of Satellite and Product Operations (OSPO) engineers will activate switching for NOAA-15 and NOAA-19 AVHRR Channel 3A / 3B for the period of 15 September 2020 to 14 May 2021. Switching to Channel 3A will occur during this period over the predefined box encompassing the Alaska Region (box coordinates 50°N to 75°N and 173°E to 135°W). NOAA-15 and NOAA-19 AVHRR will switch between Channel 3B and Channel 3A to support snow and ice detection and monitoring activities over Alaska Region. For more details please refer to the URL link below. |
Url: | https://www.ospo.noaa.gov/data/messages/2020/MSG258010404.html |
Status: | scheduled |
Issue Time: | 2020-09-15 10:11:37.0 |
Services: |
AVHRR Level 1 - NOAA EARS-AVHRR |
Type: | Service Enhancement |
Ann Nr: | 6269 |
Rev: | 3 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. |
Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed |
Status: | scheduled |
Issue Time: | 2021-01-26 16:03:54.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 6661 |
Rev: | 1 |
Start Time: | 2021-02-04 20:30:00.0 |
End Time: | 2021-03-29 23:00:00.0 |
Satellites: | MET-8 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | There is a risk of degraded image quality every night from 20:30 to 23:00 in the given time period. |
Status: | scheduled |
Issue Time: | 2021-01-27 15:19:27.0 |
Services: |
IODC SEVIRI Level 1.5 Image Data IODC Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6705 |
Rev: | 1 |
Start Time: | 2021-02-25 23:00:00.0 |
End Time: | 2021-04-13 01:30:00.0 |
Satellites: | MET-11 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | 23:00 to 01:30 UTC image data may be unavailable or incomplete. |
Status: | scheduled |
Issue Time: | 2021-02-10 15:31:09.0 |
Services: |
0° SEVIRI Level 1.5 Image Data 0° Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6716 |
Rev: | 1 |
Start Time: | 2021-02-27 11:45:00.0 |
End Time: | 2021-03-09 13:00:00.0 |
Satellites: | MET-11 |
Subject: | Sun-colinearity |
Impact: | risk-of-interruption |
Detail: | Sun Co-linearity. Repeat cycles 11:45 to 13:00 may be affected. |
Status: | scheduled |
Issue Time: | 2021-02-17 14:56:13.0 |
Services: |
0° SEVIRI Level 1.5 Image Data 0° Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 6770 |
Rev: | 1 |
Start Time: | 2021-03-04 09:00:00.0 |
End Time: | 2021-03-04 09:00:00.0 |
Subject: | general-announcement |
Detail: | Tellicast client software release 2.14.7 is now available for Linux users. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/new-tellicast-linux-version-2147-released |
Status: | scheduled |
Issue Time: | 2021-03-04 13:26:02.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 6714 |
Rev: | 1 |
Start Time: | 2021-03-04 22:30:00.0 |
End Time: | 2021-04-13 01:00:00.0 |
Satellites: | MET-10 |
Subject: | eclipse-season |
Impact: | risk-of-degradation |
Detail: | 22:30 to 01:00 UTC image data may be unavailable or incomplete. |
Status: | scheduled |
Issue Time: | 2021-02-17 14:47:24.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6767 |
Rev: | 1 |
Start Time: | 2021-03-08 14:51:00.0 |
End Time: | 2021-03-08 14:58:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2021-03-03 13:41:20.0 |
Services: |
ASCAT Level 1 - Metop-C ASCAT Soil Moisture - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6764 |
Rev: | 1 |
Start Time: | 2021-03-09 08:20:00.0 |
End Time: | 2021-03-09 08:27:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-03 13:39:02.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 6763 |
Rev: | 1 |
Start Time: | 2021-03-09 08:47:00.0 |
End Time: | 2021-03-09 08:54:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-03 13:38:16.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 6765 |
Rev: | 1 |
Start Time: | 2021-03-09 09:14:00.0 |
End Time: | 2021-03-09 09:21:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-03 13:39:51.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6766 |
Rev: | 1 |
Start Time: | 2021-03-09 09:14:00.0 |
End Time: | 2021-03-09 10:57:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-03-03 13:40:32.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6768 |
Rev: | 1 |
Start Time: | 2021-03-09 09:30:00.0 |
End Time: | 2021-03-09 13:00:00.0 |
Subject: | ground-segment-maintenance |
Detail: | EARS Maspalomas KSPT Antenna Chain Preventive Maintenance. There may be disruption to the listed imager based services during the maintenance period. Please note that only the following passes are affected : NOAA-18: orbit 81442 at 10:59 UTC, NOAA-20 orbit 17127 at 12:31 UTC and NOAA-18: orbit 81443 at 12:42 UTC. |
Status: | scheduled |
Issue Time: | 2021-03-03 15:41:27.0 |
Services: |
EARS-ATOVS EARS-CrlS EARS-ATMS EARS-VIIRS |
Type: | Service Enhancement |
Ann Nr: | 6729 |
Rev: | 1 |
Start Time: | 2021-03-10 09:00:00.0 |
End Time: | 2021-03-10 09:00:00.0 |
Subject: | product-change |
Detail: | The ‘Europe and North-Atlantic’ sub-set of Meteosat 0° cloud products generated by EUMETSAT using the NWC SAF GEO software package will be updated on 10 March 2021. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/update-sub-set-meteosat-0deg-cloud-products |
Status: | scheduled |
Issue Time: | 2021-02-18 11:53:55.0 |
Services: |
0° Meteosat Meteorological Products |
Type: | Planned Maintenance |
Ann Nr: | 6762 |
Rev: | 1 |
Start Time: | 2021-03-10 10:00:00.0 |
End Time: | 2021-03-10 12:00:00.0 |
Satellites: | Metop-A,Metop-B,Metop-C,NOAA-19 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | Due to ground segment maintenance at EUMETSAT there is a low risk of data interruption in the given time period. |
Status: | scheduled |
Issue Time: | 2021-03-01 09:12:33.0 |
Services: |
SEM L0 - Metop-A AVHRR Level 1 - Metop-A AMSU-A Level 1 - Metop-A MHS Level 1 - Metop-A HIRS Level 1 - Metop-A ASCAT Level 1 - Metop-A IASI Level 1 - Metop-A GRAS Level 1 - Metop-A GOME-2 Level 1 - Metop-A ATOVS Sounding products - Metop-A IASI Sounding Products - Metop-A ASCAT Soil Moisture - Metop-A AVHRR Polar Winds - Metop-A Multi-Sensor Products - Metop-A AMSU-A Level 1 - Metop-B SEM L0 - Metop-B AVHRR Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GOME-2 Level 1 - Metop-B GRAS Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B SEM L0 - Metop-C AVHRR Level 1 - Metop-C IASI Sounding products- Metop-C AMSU-A Level 1 - Metop-C AVHRR Polar winds - Metop-C ASCAT Soil Moisture - Metop-C MHS Level 1 - Metop-C Multi-sensor Products - Metop-C ASCAT Level 1 - Metop-C IASI Level 1 - Metop-C GOME-2 Level 1 - Metop-C GRAS Level 1 - Metop-C MHS Level 1 - NOAA AMSU-A Level 1 - NOAA AVHRR Level 1 - NOAA HIRS Level 1 - NOAA ATOVS Sounding products - NOAA |
Type: | Planned Maintenance |
Ann Nr: | 6778 |
Rev: | 2 |
Start Time: | 2021-03-11 10:00:00.0 |
End Time: | 2021-03-11 13:00:00.0 |
Subject: | ground-segment-maintenance |
Detail: | EARS Lannion core station Maintenance. There may be disruption to the following imager based services: NOAA-18: orbit time 12:09:52 UTC and orbit time 13:52:18 UTC. [Rev. 2] Start and End time updated. The affected passes are 10:28:41 and 12:09:52 UTC. |
Status: | scheduled |
Issue Time: | 2021-03-08 15:15:45.0 |
Services: |
EARS-ATOVS |
Type: | Service Enhancement |
Ann Nr: | 6769 |
Rev: | 1 |
Start Time: | 2021-03-18 09:00:00.0 |
End Time: | 2021-03-18 09:00:00.0 |
Subject: | new-product |
Detail: | NetCDF versions of H SAF H01 and H02B precipitation products will be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/netcdf-versions-h-saf-precipitation-products-available-soon |
Status: | scheduled |
Issue Time: | 2021-03-04 11:07:09.0 |
Services: |
H-SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6751 |
Rev: | 1 |
Start Time: | 2021-03-24 09:00:00.0 |
End Time: | 2021-03-24 09:00:00.0 |
Satellites: | Metop-C |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-02-24 15:19:03.0 |
Services: |
MHS Level 1 - Metop-C SEM L0 - Metop-C AVHRR Level 1 - Metop-C AMSU-A Level 1 - Metop-C IASI Level 1 - Metop-C GRAS Level 1 - Metop-C ASCAT Level 1 - Metop-C GOME-2 Level 1 - Metop-C A-DCS AHRPT Metop-C AMSU-A AHRPT Metop-C ASCAT AHRPT Metop-C GRAS AHRPT Metop-C GOME-2 AHRPT Metop-C AVHRR AHRPT Metop-C IASI AHRPT Metop-C HIRS AHRPT Metop-C MHS AHRPT Metop-C SEM AHRPT Metop-C |
Type: | Service Enhancement |
Ann Nr: | 6676 |
Rev: | 1 |
Start Time: | 2021-04-01 09:00:00.0 |
End Time: | 2021-04-01 09:00:00.0 |
Subject: | product-change |
Detail: | GOME-2 Level 1 Product Processing Facility (PPF) Version 7 is planned to be released early April 2021. Exact date will be communicated in due course. For full details and test data, see the URL provided below. |
Url: | https://www.eumetsat.int/upcoming-release-gome-2-level-1-ppf-v7 |
Status: | scheduled |
Issue Time: | 2021-01-27 16:49:11.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 Level 1 - Metop-B GOME-2 Level 1 - Metop-C |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |