Message number: | 8113 |
Message creation: | Mon Jul 26 08:48:48 UTC 2021 |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 14 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2021-07-31 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated. [Rev. 11] End date updated. [Rev. 12] End date updated. [Rev. 13] End date updated. [Rev. 14] End date updated. |
Status: | scheduled |
Issue Time: | 2021-07-08 13:15:17.0 |
Services: |
ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 1 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-12-31 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. |
Status: | scheduled |
Issue Time: | 2020-02-03 10:12:03.0 |
Services: |
A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 6269 |
Rev: | 3 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. |
Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed |
Status: | scheduled |
Issue Time: | 2021-01-26 16:03:54.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 7094 |
Rev: | 3 |
Start Time: | 2021-06-28 08:00:00.0 |
End Time: | 2021-07-30 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Kangerlussuaq Station Upgrade (Infrastructure facilities). There may be disruption to the listed EUMETSAT regional services. [Rev. 2] End date updated. [Rev. 3] End date updated. |
Status: | scheduled |
Issue Time: | 2021-07-16 09:34:10.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-ASCAT EARS-MWRI EARS-IASI EARS-CrlS EARS-ATMS EARS-VIIRS EARS-NWC EARS-MERSI EARS-VASS |
Type: | Planned Maintenance |
Ann Nr: | 7189 |
Rev: | 1 |
Start Time: | 2021-07-26 09:06:00.0 |
End Time: | 2021-07-26 09:08:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | OLCI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | |
Status: | scheduled |
Issue Time: | 2021-07-22 06:19:23.0 |
Services: |
OLCI Level 2 Marine Products - S3B OLCI Level 1 Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 7182 |
Rev: | 1 |
Start Time: | 2021-07-26 14:54:00.0 |
End Time: | 2021-07-26 15:01:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2021-07-21 12:54:27.0 |
Services: |
ASCAT Level 1 - Metop-C ASCAT Soil Moisture - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7186 |
Rev: | 1 |
Start Time: | 2021-07-26 19:00:00.0 |
End Time: | 2021-07-30 05:00:00.0 |
Satellites: | Metop-B |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | McMurdo Critical Maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available during this period.Additionally a risk of high timeliness has been identified during the following maintenance periods: On 27 July: 2330-0000Z; On 28 July: 0001- 0030Z, 0115- 0215Z, 0300- 0400Z, 2130-2230Z, 2310-0000Z; On 29 July: 0001- 0010Z, 0230- 0330Z, 2100-2200Z; On 30 July: 0215-0315Z, 0400-0500Z |
Status: | scheduled |
Issue Time: | 2021-07-22 06:31:16.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B IASI Level 1 - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B ATOVS Sounding products - Metop-B IASI Sounding Products - Metop-B AVHRR Polar Winds - Metop-B ASCAT Soil Moisture - Metop-B Multi-Sensor Products - Metop-B Multi-Metop Wind Products |
Type: | Planned Maintenance |
Ann Nr: | 7137 |
Rev: | 3 |
Start Time: | 2021-07-27 08:00:00.0 |
End Time: | 2021-07-27 18:00:00.0 |
Satellites: | Metop-C |
Subsystem: | IASI |
Subject: | instrument-maintenance |
Impact: | data-unavailable |
Detail: | IASI Instrument maintenance. Data will be unavailable during the maintenance period.[Rev:2] This activity has been postponed until further notice.[Rev:3] This activity is now schedule for the 27/07/21. Start time and End time have been updated. |
Status: | scheduled |
Issue Time: | 2021-07-23 09:03:21.0 |
Services: |
IASI Level 1 - Metop-C IASI Sounding products- Metop-C EARS-IASI IASI AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7180 |
Rev: | 1 |
Start Time: | 2021-07-27 08:24:00.0 |
End Time: | 2021-07-27 08:31:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-07-21 12:52:27.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 7178 |
Rev: | 1 |
Start Time: | 2021-07-27 08:50:00.0 |
End Time: | 2021-07-27 08:57:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-07-21 12:48:56.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 7183 |
Rev: | 1 |
Start Time: | 2021-07-27 09:17:00.0 |
End Time: | 2021-07-27 09:24:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-07-21 12:56:14.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 7184 |
Rev: | 1 |
Start Time: | 2021-07-27 09:17:00.0 |
End Time: | 2021-07-27 11:00:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-07-21 12:57:24.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Service Enhancement |
Ann Nr: | 7177 |
Rev: | 1 |
Start Time: | 2021-07-29 09:00:00.0 |
End Time: | 2021-07-29 09:00:00.0 |
Subject: | product-change |
Detail: | Release of a new Processing Baseline PB 1.57B, for Sentinel-3 OLCI Level 1. This Processing Baseline introduces an update for geometric and radiometric calibration for OLCI-B. The geometric update is to prevent expected degradation in OLCI-B geolocation from August 2021 onwards, and there is only a minor impact on the products. The radiometric update is to restore OLCI-B radiometric performance to within 0.1% in band Oa01, which drifts the most, and to improve the trend in other bands, such as Oa02, where the trend depends is on the camera and detectors. |
Status: | scheduled |
Issue Time: | 2021-07-21 14:31:22.0 |
Services: |
OLCI Level 2 Marine Products - S3B OLCI Level 1 Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 7185 |
Rev: | 1 |
Start Time: | 2021-07-29 10:00:00.0 |
End Time: | 2021-07-29 15:00:00.0 |
Subject: | ground-segment-maintenance |
Detail: | Due to an EARS ground segment maintenance there may be disruption to the listed EUMETSAT based services. |
Status: | scheduled |
Issue Time: | 2021-07-21 13:01:53.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-MWRI EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 7187 |
Rev: | 1 |
Start Time: | 2021-07-29 18:17:00.0 |
End Time: | 2021-07-29 19:16:00.0 |
Satellites: | Metop-A |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2021-07-21 13:25:21.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7181 |
Rev: | 1 |
Start Time: | 2021-07-29 19:15:00.0 |
End Time: | 2021-07-29 20:14:00.0 |
Satellites: | Metop-C |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2021-07-21 12:53:17.0 |
Services: |
GOME-2 Level 1 - Metop-C GOME-2 AHRPT Metop-C AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7179 |
Rev: | 1 |
Start Time: | 2021-07-29 19:44:00.0 |
End Time: | 2021-07-29 20:43:00.0 |
Satellites: | Metop-B |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2021-07-21 12:50:56.0 |
Services: |
GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 7193 |
Rev: | 1 |
Start Time: | 2021-07-29 21:00:00.0 |
End Time: | 2021-07-29 22:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Moscow Contributing Station line Maintenance. There is potential interruption to product generation from Moscow station during the indicated time period. |
Status: | scheduled |
Issue Time: | 2021-07-26 08:06:20.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-ASCAT EARS-IASI EARS-ATMS EARS-CrlS EARS-NWC |
Type: | Planned Maintenance |
Ann Nr: | 7032 |
Rev: | 2 |
Start Time: | 2021-08-01 00:00:00.0 |
End Time: | 2021-09-30 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | ASCAT Extensive Calibration. Short outages of the ASCAT GDS Level 1, soil moisture and global and regional winds products can be expected, during satellite passes over Turkey. [Rev .2] Start and End date updated. |
Status: | scheduled |
Issue Time: | 2021-07-08 13:36:16.0 |
Services: |
ASCAT Level 1 - Metop-A ASCAT Soil Moisture - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 7188 |
Rev: | 1 |
Start Time: | 2021-08-03 06:30:00.0 |
End Time: | 2021-08-03 16:00:00.0 |
Satellites: | MET-10 |
Subject: | general-announcement |
Impact: | risk-of-degradation |
Detail: | Meteosat-10 tank heater test. During the test period, the geometric image quality may occasionally be out of specification. |
Status: | scheduled |
Issue Time: | 2021-07-21 14:17:13.0 |
Services: |
RSS SEVIRI Level 1.5 Image Data RSS Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 7147 |
Rev: | 1 |
Start Time: | 2021-08-03 09:00:00.0 |
End Time: | 2021-08-03 09:00:00.0 |
Subject: | general-announcement |
Detail: | OSFAC and ECOWAS products will be distributed on new EUMETCast channels. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/osfac-ecowas-products-new-distribution |
Status: | scheduled |
Issue Time: | 2021-07-14 14:24:48.0 |
Services: |
Misc |
Type: | Service Enhancement |
Ann Nr: | 7033 |
Rev: | 1 |
Start Time: | 2021-11-01 09:00:00.0 |
End Time: | 2021-11-01 09:00:00.0 |
Subject: | product-change |
Detail: | Principal Component (PC) compressed IASI L1C data will be updated in November 2021 (exact date to be announced in due course). For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/changes-pc-compressed-iasi-l1c-data |
Status: | scheduled |
Issue Time: | 2021-06-02 13:18:50.0 |
Services: |
IASI Level 1 - Metop-A IASI Level 1 - Metop-B IASI Level 1 - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 6944 |
Rev: | 1 |
Start Time: | 2021-11-09 09:00:00.0 |
End Time: | 2021-11-09 09:00:00.0 |
Subject: | general-announcement |
Detail: | Change to DCP messages disseminated on EUMETCast. They will no longer be wrapped into LRIT files and, instead, will be disseminated as individual files. This will also involve a filename change and a change of EUMETCast channels. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/change-dcp-messages-disseminated-eumetcast |
Status: | scheduled |
Issue Time: | 2021-04-29 13:24:50.0 |
Services: |
Meteosat 0° DCP Meteosat IODC DCP |
Type: | Service Enhancement |
Ann Nr: | 6863 |
Rev: | 1 |
Start Time: | 2021-11-16 09:00:00.0 |
End Time: | 2021-11-16 09:00:00.0 |
Satellites: | Metop-A |
Subject: | general-announcement |
Detail: | Metop-A is planned to be de-orbited in November 2021. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/plans-metop-end-life |
Status: | scheduled |
Issue Time: | 2021-04-01 13:02:07.0 |
Services: |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |