Message number: | 7859 |
Message creation: | Fri Apr 30 12:03:49 UTC 2021 |
Type: | Planned Maintenance |
Ann Nr: | 5475 |
Rev: | 11 |
Start Time: | 2020-01-06 00:00:00.0 |
End Time: | 2021-06-29 00:00:00.0 |
Satellites: | Metop-A |
Subsystem: | ASCAT |
Subject: | general-announcement |
Impact: | risk-of-interruption |
Detail: | Calibrations to support transponder test. Outages of products can be expected, during satellite passes over Turkey. [Rev. 2] End date updated. [Rev. 3] End date updated to 19th April 2020.[Rev. 4] End date updated. [Rev. 5] End date updated. [Rev. 6] End date updated. [Rev 7] End date updated. [Rev 8] End date updated. [Rev 9] End date updated. [Rev. 10] End date updated. [Rev. 11] End date updated. |
Status: | scheduled |
Issue Time: | 2021-03-30 10:02:40.0 |
Services: |
ASCAT Soil Moisture - Metop-A ASCAT Level 1 - Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 5596 |
Rev: | 1 |
Start Time: | 2020-01-29 00:00:00.0 |
End Time: | 2021-12-31 23:59:00.0 |
Satellites: | Metop-A |
Subsystem: | HRPT |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | HRPT switching zone drift. Risk of interruption. The Metop-A satellite is currently in drifting orbit. As a consequence the geographical zones, defined to control the switching times of the satellite HRPT system, are drifting westwards at a rate of 0.02 degree per day. Users near the borders of switching zones might experience small changes in their acquisition times of the HRPT signal. On-board timings will be updated approximately every 8 months to compensate for the drift geolocation. A dedicated announcement will be issued in advance of each of these updates. |
Status: | scheduled |
Issue Time: | 2020-02-03 10:12:03.0 |
Services: |
A-DCS AHRPT Metop-A ASCAT AHRPT Metop-A AMSU-A AHRPT Metop-A AVHRR AHRPT Metop-A IASI AHRPT Metop-A HIRS AHRPT Metop-A GRAS AHRPT Metop-A MHS AHRPT Metop-A GOME-2 AHRPT Metop-A SEM AHRPT Metop-A |
Type: | Service Enhancement |
Ann Nr: | 6259 |
Rev: | 1 |
Start Time: | 2020-09-15 00:00:00.0 |
End Time: | 2021-05-15 00:00:00.0 |
Satellites: | NOAA-15,NOAA-19 |
Subsystem: | AVHRR |
Subject: | general-announcement |
Detail: | NESDIS Office of Satellite and Product Operations (OSPO) engineers will activate switching for NOAA-15 and NOAA-19 AVHRR Channel 3A / 3B for the period of 15 September 2020 to 14 May 2021. Switching to Channel 3A will occur during this period over the predefined box encompassing the Alaska Region (box coordinates 50°N to 75°N and 173°E to 135°W). NOAA-15 and NOAA-19 AVHRR will switch between Channel 3B and Channel 3A to support snow and ice detection and monitoring activities over Alaska Region. For more details please refer to the URL link below. |
Url: | https://www.ospo.noaa.gov/data/messages/2020/MSG258010404.html |
Status: | scheduled |
Issue Time: | 2020-09-15 10:11:37.0 |
Services: |
AVHRR Level 1 - NOAA EARS-AVHRR |
Type: | Service Enhancement |
Ann Nr: | 6269 |
Rev: | 3 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data will be removed from EUMETCast Satellite on 29 July 2021. Alternative services to access these data are available. For full details, see the URL provided below. [Rev. 2]: URL updated, following the launch of the new EUMETSAT website on 16 November 2020. [Rev. 3]: The removal of Sentinel-3 OLCI Level-1 Full Resolution Near Real Time data from EUMETCast Satellite, initially planned for 29 July 2021, is being deferred to a later date (likely to be during the last quarter of 2021). This is to allow more time for users to transition to alternative access services. |
Url: | https://www.eumetsat.int/S3-olci-l1-nrt-on-eumetcast-satellite-removed |
Status: | scheduled |
Issue Time: | 2021-01-26 16:03:54.0 |
Services: |
OLCI Level 1 Products - S3A OLCI Level 1 Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 6770 |
Rev: | 1 |
Start Time: | 2021-03-04 09:00:00.0 |
End Time: | 2021-03-04 09:00:00.0 |
Subject: | general-announcement |
Detail: | Tellicast client software release 2.14.7 is now available for Linux users. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/new-tellicast-linux-version-2147-released |
Status: | scheduled |
Issue Time: | 2021-03-04 13:26:02.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 6856 |
Rev: | 1 |
Start Time: | 2021-04-08 06:00:00.0 |
End Time: | 2021-05-04 12:00:00.0 |
Satellites: | GOES-17 |
Subject: | instrument-special-operation |
Impact: | risk-of-interruption |
Detail: | NOAA will conduct a GOES-West ABI Cooling Timeline Operation from 8 April – 4 May 2021, every day from 06:00 to 12:00 UTC. During this phase, GOES-17 operations mode will change from MODE 6 to MODE 3, and this will affect the GOES-West ABI data distribution on EUMETCast. For full details, see the URL provided below. Users wishing to receive the MODE 3 data should contact our User Helpdesk at ops@eumetsat.int. |
Url: | https://www.eumetsat.int/goes17-abi-mode3-cooling-timeline-implementation |
Status: | scheduled |
Issue Time: | 2021-03-31 15:10:50.0 |
Services: |
GOES Products |
Type: | Service Enhancement |
Ann Nr: | 6946 |
Rev: | 1 |
Start Time: | 2021-04-26 09:00:00.0 |
End Time: | 2021-04-26 09:00:00.0 |
Subject: | general-announcement |
Detail: | New Tellicast client software version 2.14.7-1 is now available for Windows users. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/tellicast-windows-version-2147-1-released |
Status: | scheduled |
Issue Time: | 2021-04-29 13:30:08.0 |
Services: |
Type: | Planned Maintenance |
Ann Nr: | 6948 |
Rev: | 1 |
Start Time: | 2021-05-03 07:00:00.0 |
End Time: | 2021-05-03 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | Maintenance on the IPMA Satellite Reception System. Interruptions or delays might be observed during the maintenance period. |
Status: | scheduled |
Issue Time: | 2021-04-30 07:27:37.0 |
Services: |
LSA SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6941 |
Rev: | 1 |
Start Time: | 2021-05-03 08:00:00.0 |
End Time: | 2021-05-07 17:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Kangerlussuaq Core Station Maintenance. There may be disruption to the listed EUMETSAT regional services. The maintenance is daily between 08:00 and 17:00 UTC in the planned period. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:53:41.0 |
Services: |
EARS-ATOVS EARS-AVHRR EARS-MWRI EARS-ASCAT EARS-IASI EARS-CrlS EARS-ATMS EARS-VIIRS EARS-NWC EARS-MERSI EARS-VASS |
Type: | Service Enhancement |
Ann Nr: | 6807 |
Rev: | 1 |
Start Time: | 2021-05-03 09:00:00.0 |
End Time: | 2021-05-07 14:00:00.0 |
Subject: | general-announcement |
Detail: | Test activation of the backup satellite, HOTBIRD 13C, for the EUMETCast Europe service. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/eumetcast-europe-backup-satellite-activation |
Status: | scheduled |
Issue Time: | 2021-03-17 14:07:41.0 |
Services: |
EUMETCast-Europe |
Type: | Planned Maintenance |
Ann Nr: | 6939 |
Rev: | 1 |
Start Time: | 2021-05-03 13:52:00.0 |
End Time: | 2021-05-03 13:59:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | Gain Compression |
Status: | scheduled |
Issue Time: | 2021-04-28 13:37:26.0 |
Services: |
ASCAT Soil Moisture - Metop-C ASCAT Level 1 - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6934 |
Rev: | 1 |
Start Time: | 2021-05-03 18:17:00.0 |
End Time: | 2021-05-03 19:16:00.0 |
Satellites: | Metop-A |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:32:29.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 AHRPT Metop-A AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6938 |
Rev: | 1 |
Start Time: | 2021-05-03 19:15:00.0 |
End Time: | 2021-05-03 20:14:00.0 |
Satellites: | Metop-C |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:36:35.0 |
Services: |
GOME-2 Level 1 - Metop-C GOME-2 AHRPT Metop-C AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6936 |
Rev: | 1 |
Start Time: | 2021-05-03 19:44:00.0 |
End Time: | 2021-05-03 20:43:00.0 |
Satellites: | Metop-B |
Subsystem: | GOME-2 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | GOME2 monthly measurements of GOME-2 polarisation (PMD) data in raw readout mode (PMDRAW). The AC SAF Near Real Time Total Column products (Total Column Ozone, the Total Column NO2, and the Tropospheric NO2) will be unavailable. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:34:41.0 |
Services: |
GOME-2 Level 1 - Metop-B GOME-2 AHRPT Metop-B AC SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 6899 |
Rev: | 3 |
Start Time: | 2021-05-03 22:50:00.0 |
End Time: | 2021-05-03 23:20:00.0 |
Satellites: | GOES-16 |
Subject: | Maintenance Manoeuvre |
Impact: | data-unavailable |
Detail: | A spacecraft maintenance manoeuvre will be performed on GOES-16. ABI, SUVI, and EXIS products will experience a data outage, GLM may have excessive false events. [Rev. 2] The manoeuvre has been postponed and will be rescheduled. [Rev. 3] New date scheduled. |
Status: | postponed |
Issue Time: | 2021-04-22 14:47:58.0 |
Services: |
GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 6937 |
Rev: | 1 |
Start Time: | 2021-05-04 08:15:00.0 |
End Time: | 2021-05-04 08:22:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:35:37.0 |
Services: |
SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6935 |
Rev: | 1 |
Start Time: | 2021-05-04 09:02:00.0 |
End Time: | 2021-05-04 09:09:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:33:23.0 |
Services: |
SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 6932 |
Rev: | 1 |
Start Time: | 2021-05-04 09:29:00.0 |
End Time: | 2021-05-04 09:36:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:30:58.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 6933 |
Rev: | 1 |
Start Time: | 2021-05-04 09:29:00.0 |
End Time: | 2021-05-04 11:12:00.0 |
Satellites: | Metop-A |
Subsystem: | SEM |
Component: | TED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM TED in flight calibration. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:31:41.0 |
Services: |
SEM L0 - Metop-A SEM AHRPT Metop-A |
Type: | Planned Maintenance |
Ann Nr: | 6930 |
Rev: | 1 |
Start Time: | 2021-05-04 16:58:00.0 |
End Time: | 2021-05-04 16:59:00.0 |
Satellites: | MET-8 |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | East-West Station Keeping Manoeuvre. Users may experience degraded image quality and degraded meteorological product quality up to a few hours after the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:27:17.0 |
Services: |
IODC Meteosat Meteorological Products IODC SEVIRI Level 1.5 Image Data |
Type: | Planned Maintenance |
Ann Nr: | 6942 |
Rev: | 1 |
Start Time: | 2021-05-05 13:49:00.0 |
End Time: | 2021-05-05 16:08:00.0 |
Satellites: | Jason-3 |
Subject: | instrument-maintenance |
Impact: | risk-of-interruption |
Detail: | Due to instrument scheduled maintenance activity, there is risk of unavailability of OGDR data of a few seconds on 05 May 21 during the following time frames : from 13:49 UTC to 14:11 UTC and from 15:46 UTC to 16:08 UTC. |
Status: | scheduled |
Issue Time: | 2021-04-29 08:13:51.0 |
Services: |
Jason-3 OGDR |
Type: | Planned Maintenance |
Ann Nr: | 6924 |
Rev: | 1 |
Start Time: | 2021-05-05 15:00:00.0 |
End Time: | 2021-05-05 18:00:00.0 |
Satellites: | Himawari-8 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | The Japan Meteorological Agency (JMA) has scheduled Himawari-8 system maintenance. Himawari-8 data may not be available or delayed for about 10 minutes in given period. |
Status: | scheduled |
Issue Time: | 2021-04-23 07:56:15.0 |
Services: |
Himawari Products |
Type: | Planned Maintenance |
Ann Nr: | 6940 |
Rev: | 1 |
Start Time: | 2021-05-05 18:06:00.0 |
End Time: | 2021-05-05 18:07:00.0 |
Satellites: | Jason-3 |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Station keeping manoeuvre. The semi-major axis will be increased by 5 to 6 m (TBC) resulting in radial orbit errors in the OGDRs. OGDR products may be degraded 30 minutes before and up to 2 hours after the manoeuvre. This will affect the sea surface height, but not the wind and wave content in the products. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:44:27.0 |
Services: |
Jason-3 OGDR |
Type: | Service Enhancement |
Ann Nr: | 6918 |
Rev: | 1 |
Start Time: | 2021-05-06 09:00:00.0 |
End Time: | 2021-05-06 09:00:00.0 |
Subject: | new-product |
Detail: | MTVZA-GY data from Roshydromet Meteor-M N2-2 satellite to be available on EUMETCast. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/meteor-m-n2-2-data-on-eumetcast |
Status: | scheduled |
Issue Time: | 2021-04-22 08:57:57.0 |
Services: |
Meteor-M N2 Products |
Type: | Service Enhancement |
Ann Nr: | 6920 |
Rev: | 1 |
Start Time: | 2021-05-06 09:00:00.0 |
End Time: | 2021-05-06 09:00:00.0 |
Subject: | product-change |
Detail: | Release of a new version, V2.2.4, of the Metop Polar Multi-sensor Aerosol optical properties product (PMAp). For full details and test data, see the URL provided below. |
Url: | https://www.eumetsat.int/new-version-metop-pmap-product-released-soon |
Status: | scheduled |
Issue Time: | 2021-04-22 12:09:05.0 |
Services: |
Multi-Sensor Products - Metop-A Multi-Sensor Products - Metop-B Multi-sensor Products - Metop-C |
Type: | Service Enhancement |
Ann Nr: | 6943 |
Rev: | 1 |
Start Time: | 2021-05-06 09:00:00.0 |
End Time: | 2021-05-06 09:00:00.0 |
Subject: | product-change |
Detail: | Release of a new Processing Baseline, PB 1.2, of Copernicus Sentinel-3 NRT Fire Radiative Power product. This new Processing Baseline provides enhanced observation of small fires. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/sentinel-3-nrt-frp-processing-baseline-12-released-soon |
Status: | scheduled |
Issue Time: | 2021-04-29 13:19:30.0 |
Services: |
SLSTR Level 2 Atmospheric Products - S3A SLSTR Level 2 Atmospheric Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 6945 |
Rev: | 1 |
Start Time: | 2021-05-06 09:00:00.0 |
End Time: | 2021-05-06 09:00:00.0 |
Subject: | service-change |
Detail: | Sentinel-3 OLCI Level 2 Full Resolution NRT product will be available on EUMETCast Europe. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/olci-level-2-full-resolution-nrt-product-eumetcast-europe-soon |
Status: | scheduled |
Issue Time: | 2021-04-29 13:28:25.0 |
Services: |
OLCI Level 2 Marine Products - S3A OLCI Level 2 Marine Products - S3B |
Type: | Service Enhancement |
Ann Nr: | 6676 |
Rev: | 2 |
Start Time: | 2021-05-18 09:00:00.0 |
End Time: | 2021-05-18 09:00:00.0 |
Subject: | product-change |
Detail: | GOME-2 Level 1 Product Processing Facility (PPF) Version 7 is planned to be released early April 2021. Exact date will be communicated in due course. For full details and test data, see the URL provided below. [Rev. 2]: The release is postponed to the second half of May 2021, with exact date to be communicated in due course. |
Url: | https://www.eumetsat.int/upcoming-release-gome-2-level-1-ppf-v7 |
Status: | scheduled |
Issue Time: | 2021-03-11 08:16:29.0 |
Services: |
GOME-2 Level 1 - Metop-A GOME-2 Level 1 - Metop-B GOME-2 Level 1 - Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 6931 |
Rev: | 1 |
Start Time: | 2021-05-19 09:00:00.0 |
End Time: | 2021-05-19 09:00:00.0 |
Satellites: | Metop-B |
Subject: | in-plane-manoeuvre |
Impact: | data-degraded |
Detail: | Routine in-plane manoeuvre. Reduced data quality should be expected for data sensed during this period. The exact burn time will be announced closer to the day of the manoeuvre. |
Status: | scheduled |
Issue Time: | 2021-04-28 13:30:07.0 |
Services: |
SEM L0 - Metop-B AVHRR Level 1 - Metop-B AMSU-A Level 1 - Metop-B MHS Level 1 - Metop-B HIRS Level 1 - Metop-B ASCAT Level 1 - Metop-B ATOVS Sounding products - Metop-B GRAS Level 1 - Metop-B GOME-2 Level 1 - Metop-B IASI Level 1 - Metop-B IASI Sounding Products - Metop-B ASCAT Soil Moisture - Metop-B AVHRR Polar Winds - Metop-B Multi-Sensor Products - Metop-B A-DCS AHRPT Metop-B ASCAT AHRPT Metop-B AMSU-A AHRPT Metop-B AVHRR AHRPT Metop-B GOME-2 AHRPT Metop-B GRAS AHRPT Metop-B HIRS AHRPT Metop-B IASI AHRPT Metop-B MHS AHRPT Metop-B SEM AHRPT Metop-B |
Type: | Service Enhancement |
Ann Nr: | 6836 |
Rev: | 1 |
Start Time: | 2021-06-30 09:00:00.0 |
End Time: | 2021-06-30 09:00:00.0 |
Subject: | general-announcement |
Detail: | Discontinuation of the Meteosat SEVIRI Total Ozone product. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/meteosat-seviri-total-ozone-product-discontinued |
Status: | scheduled |
Issue Time: | 2021-03-24 15:20:09.0 |
Services: |
0° Meteosat Meteorological Products IODC Meteosat Meteorological Products |
Type: | Service Enhancement |
Ann Nr: | 6944 |
Rev: | 1 |
Start Time: | 2021-11-09 09:00:00.0 |
End Time: | 2021-11-09 09:00:00.0 |
Subject: | general-announcement |
Detail: | Change to DCP messages disseminated on EUMETCast. They will no longer be wrapped into LRIT files and, instead, will be disseminated as individual files. This will also involve a filename change and a change of EUMETCast channels. For full details, see the URL provided below. |
Url: | https://www.eumetsat.int/change-dcp-messages-disseminated-eumetcast |
Status: | scheduled |
Issue Time: | 2021-04-29 13:24:50.0 |
Services: |
Meteosat 0° DCP Meteosat IODC DCP |
Type: | Service Enhancement |
Ann Nr: | 6863 |
Rev: | 1 |
Start Time: | 2021-11-16 09:00:00.0 |
End Time: | 2021-11-16 09:00:00.0 |
Satellites: | Metop-A |
Subject: | general-announcement |
Detail: | Metop-A is planned to be de-orbited in November 2021. For more details, see the URL provided below. |
Url: | https://www.eumetsat.int/plans-metop-end-life |
Status: | scheduled |
Issue Time: | 2021-04-01 13:02:07.0 |
Services: |
Name: | EUMETSAT |
Address: |
Eumetsat-Allee 1 D-64295 Darmstadt Germany |
Telephone: | +49 6151 807 3660/3770 |
Fax: | +49 6151 807 3790 |
E-mail: | ops@eumetsat.int |
Internet: | www.eumetsat.int |