Update #1 (Final Update): Data is flowing again from the Florida PIP Circuit. We are still awaiting a root cause from the LUT Vendor.
Topic: SARSAT Florida PIP Circuit Outage
Date/Time Issued: July 9, 2022 0925Z
Product(s) or Data Impacted: Florida Medium Earth Orbit (MEO), Florida 3 and Florida 4 Low Earth Orbit (LEO)
Date/Time of Initial Impact: July 8 2022 1537Z
Date/Time of Expected End: July 9, 2022 0747Z
Length of Outage: 16 Hours 40 Minutes
Details/Specifics of Change: Florida MEO PIP circuit in Miami, FL is down. A trouble ticket has been opened with Verizon.
Impact: Significant-Dual satellite tracking capability lost. Distress alert detection/reporting timeliness affected.
Contact Information for Further Information: USMCC Operations usmcc@noaa.gov at
301-817-4576
Web Site(s) for applicable information: N/A
Impact: Significant
Contact Information for Further Information: USMCC Operations usmcc@noaa.gov at
301-817-4576