Topic: Eumetsat Weekly Operations Schedule - Week 18
Date/Time Issued: April 27, 2023 1549Z
Product(s) or Data Impacted: See list below.
Date/Time of Initial Impact: April 27, 2023,
1444Z (from the Eumetsat Operation Schedule)
Date/Time of Expected End: See list below.
Details/Specifics of Change: See list below
Message number: |
10506 |
Message creation: |
Thu Apr 27 14:44:21 UTC 2023 |
Type: |
Planned Maintenance |
Ann Nr: |
9204 |
Rev: |
0 |
Start Time: |
2023-01-31 09:39:00.0 |
Satellites: |
Sentinel-3B |
Subsystem: |
SRAL |
Subject: |
instrument-calibration |
Impact: |
data-degraded |
Detail: |
Starting 31/01/2023 09:39:49 S3B will start performing SRAL external calibrations over a transponder site in Leonessa. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.27 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 306 - from cycle 75 (inclusive) onwards. |
Revision History: |
|
Status: |
scheduled |
Issue Time: |
2023-01-25 17:19:20.0 |
Services: |
SRAL Level 1 Products - S3B |
Type: |
Planned Maintenance |
Ann Nr: |
9205 |
Rev: |
0 |
Start Time: |
2023-02-02 10:28:00.0 |
Satellites: |
Sentinel-3B |
Subsystem: |
SRAL |
Subject: |
instrument-calibration |
Impact: |
data-degraded |
Detail: |
Starting 02/02/2023 10:28:30 S3B will start performing SRAL external calibrations over a corner reflector site in Spain. To conduct this pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.26 seconds over the transponder location (42.052°N, 0.7300° E) for all relative orbits number (RON) 335 - from cycle 75 (inclusive) onwards |
Revision History: |
|
Status: |
scheduled |
Issue Time: |
2023-01-25 17:19:08.0 |
Services: |
SRAL Level 1 Products - S3B |
Type: |
Planned Maintenance |
Ann Nr: |
9258 |
Rev: |
0 |
Start Time: |
2023-02-14 20:35:00.0 |
Satellites: |
Sentinel-3A |
Subsystem: |
SRAL |
Subject: |
instrument-calibration |
Impact: |
data-degraded |
Detail: |
Starting 14/02/2023 20:35:57 S3A will start performing SRAL external calibrations over a transponder in Leonessa, Italy. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.28 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 270 from cycle 95 (inclusive) onwards |
Revision History: |
|
Status: |
scheduled |
Issue Time: |
2023-02-08 09:22:43.0 |
Services: |
SRAL Level 1 Products - S3A |
Type: |
Service Enhancement |
Ann Nr: |
9420 |
Rev: |
0 |
Start Time: |
2023-03-20 15:00:00.0 |
End Time: |
2023-09-21 15:00:00.0 |
Satellites: |
MET-9 |
Subject: |
general-announcement |
Detail: |
From 20/03/2023, the daily Meteosat-9 Upper HRV Window shift time will change from 14:00 UTC to 15:00 UTC to better optimise the illumination for the Spring/Summer season. The 15:00 UTC shift time will remain in place until 21 September 2023 included. |
Revision History: |
|
Status: |
scheduled |
Issue Time: |
2023-03-17 08:52:52.0 |
Services: |
IODC Meteosat Meteorological
Products |
Type: |
Service Enhancement |
Ann Nr: |
9447 |
Rev: |
0 |
Start Time: |
2023-04-12 09:00:00.0 |
Subject: |
service-change |
Detail: |
Data access from the Data Centre is being migrated to the Data Store, for easier and faster access. For full details, see the URL provided below. |
Revision History: |
|
Url: |
|
Issue Time: |
2023-03-29 13:44:49.0 |
Services: |
EUMETSAT Data Centre |
Type: |
Service Enhancement |
Ann Nr: |
9538 |
Rev: |
0 |
Start Time: |
2023-04-21 09:00:00.0 |
End Time: |
2023-04-21 09:00:00.0 |
Subject: |
new-product |
Detail: |
Release of AC SAF Offline level 3 daily and monthly trace gas column products from GOME-2. For full details, see the URL provided below. |
Revision History: |
|
Url: |
https://www.eumetsat.int/new-ac-saf-gome-2-products-released |
Issue Time: |
2023-04-27 13:19:08.0 |
Services: |
AC SAF - Products |
Type: |
Planned Maintenance |
Ann Nr: |
9497 |
Rev: |
1 |
Start Time: |
2023-04-27 14:00:00.0 |
End Time: |
2023-05-01 00:00:00.0 |
Satellites: |
Metop-B |
Subject: |
ground-segment-maintenance |
Impact: |
data-unavailable |
Detail: |
McMurdo maintenance. The enhanced timeliness achieved for Metop-B data through the Antarctic Data Acquisition (ADA) system will be interrupted. Therefore only nominal Arctic timeliness will be available on 27-Apri-2023 between 14:00 UTC and 15:30 UTC. Risk of data degradation is to be expected during the whole maintenance period provided. |
Revision History: |
|
Status: |
scheduled |
Issue Time: |
2023-04-20 14:54:01.0 |
Services: |
SEM L0 - Metop-B |
Type: |
Service Enhancement |
Ann Nr: |
9515 |
Rev: |
0 |
Start Time: |
2023-04-30 23:59:00.0 |
End Time: |
2023-04-30 23:59:00.0 |
Subject: |
general-announcement |
Detail: |
ESA has announced that nominal Aeolus mission operations will end on 30 April 2023, at 23:59 UTC. The Aeolus Level 2B Winds will, therefore, stop being distributed on this same date. For more details, see the URL provided below. |
Revision History: |
|
Url: |
https://www.eumetsat.int/end-nominal-aeolus-mission-operations |
Issue Time: |
2023-04-24 15:06:18.0 |
Services: |
Aeolus Level 2 Products |
Type: |
Planned Maintenance |
Ann Nr: |
9533 |
Rev: |
0 |
Start Time: |
2023-05-01 09:00:00.0 |
End Time: |
2023-05-01 09:00:00.0 |
Satellites: |
Suomi NPP |
Subject: |
VIIRS Lunar Roll |
Impact: |
data-unavailable |
Detail: |
Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Revision History: |
|
[Message clipped] View entire message