Topic: Eumetsat Weekly Operations Schedule - Week 18 Issue 2
Date/Time Issued: April 28, 2023 1355Z
Product(s) or Data Impacted: See list below.
Date/Time of Initial Impact: April 26, 2023, 1440Z (from the Eumetsat Operation Schedule)
Date/Time of Expected End: See list below.
Details/Specifics of Change: See list below
Message number: | 10511 |
Message creation: | Fri Apr 28 13:44:14 UTC 2023 |
Type: | Planned Maintenance |
Ann Nr: | 9204 |
Rev: | 0 |
Start Time: | 2023-01-31 09:39:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | SRAL |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | Starting 31/01/2023 09:39:49 S3B will start performing SRAL external calibrations over a transponder site in Leonessa. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.27 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 306 - from cycle 75 (inclusive) onwards. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-01-25 17:19:20.0 |
Services: | SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9205 |
Rev: | 0 |
Start Time: | 2023-02-02 10:28:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | SRAL |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | Starting 02/02/2023 10:28:30 S3B will start performing SRAL external calibrations over a corner reflector site in Spain. To conduct this pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.26 seconds over the transponder location (42.052°N, 0.7300° E) for all relative orbits number (RON) 335 - from cycle 75 (inclusive) onwards |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-01-25 17:19:08.0 |
Services: | SRAL Level 1 Products - S3B SRAL Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9258 |
Rev: | 0 |
Start Time: | 2023-02-14 20:35:00.0 |
Satellites: | Sentinel-3A |
Subsystem: | SRAL |
Subject: | instrument-calibration |
Impact: | data-degraded |
Detail: | Starting 14/02/2023 20:35:57 S3A will start performing SRAL external calibrations over a transponder in Leonessa, Italy. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.28 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 270 from cycle 95 (inclusive) onwards |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-02-08 09:22:43.0 |
Services: | SRAL Level 1 Products - S3A SRAL Level 2 Marine Products - S3A |
Type: | Service Enhancement |
Ann Nr: | 9420 |
Rev: | 0 |
Start Time: | 2023-03-20 15:00:00.0 |
End Time: | 2023-09-21 15:00:00.0 |
Satellites: | MET-9 |
Subject: | general-announcement |
Detail: | From 20/03/2023, the daily Meteosat-9 Upper HRV Window shift time will change from 14:00 UTC to 15:00 UTC to better optimise the illumination for the Spring/Summer season. The 15:00 UTC shift time will remain in place until 21 September 2023 included. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-03-17 08:52:52.0 |
Services: | IODC Meteosat Meteorological Products IODC SEVIRI Level 1.5 Image Data |
Type: | Service Enhancement |
Ann Nr: | 9447 |
Rev: | 0 |
Start Time: | 2023-04-12 09:00:00.0 |
Subject: | service-change |
Detail: | Data access from the Data Centre is being migrated to the Data Store, for easier and faster access. For full details, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/transition-data-centre-data-store |
Issue Time: | 2023-03-29 13:44:49.0 |
Services: | EUMETSAT Data Centre |
Type: | Service Enhancement |
Ann Nr: | 9538 |
Rev: | 0 |
Start Time: | 2023-04-21 09:00:00.0 |
End Time: | 2023-04-21 09:00:00.0 |
Subject: | new-product |
Detail: | Release of AC SAF Offline level 3 daily and monthly trace gas column products from GOME-2. For full details, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/new-ac-saf-gome-2-products-released |
Issue Time: | 2023-04-27 13:19:08.0 |
Services: | AC SAF - Products |
Type: | Service Enhancement |
Ann Nr: | 9515 |
Rev: | 0 |
Start Time: | 2023-04-30 23:59:00.0 |
End Time: | 2023-04-30 23:59:00.0 |
Subject: | general-announcement |
Detail: | ESA has announced that nominal Aeolus mission operations will end on 30 April 2023, at 23:59 UTC. The Aeolus Level 2B Winds will, therefore, stop being distributed on this same date. For more details, see the URL provided below. |
Revision History: | |
Url: | https://www.eumetsat.int/end-nominal-aeolus-mission-operations |
Issue Time: | 2023-04-24 15:06:18.0 |
Services: | Aeolus Level 2 Products |
Type: | Planned Maintenance |
Ann Nr: | 9533 |
Rev: | 0 |
Start Time: | 2023-05-01 09:00:00.0 |
End Time: | 2023-05-01 09:00:00.0 |
Satellites: | Suomi NPP |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:54:38.0 |
Services: | EARS-VIIRS CrIS Level 1 - JPSS ATMS Level 1 - JPSS VIIRS EDR - JPSS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 9534 |
Rev: | 0 |
Start Time: | 2023-05-01 09:00:00.0 |
End Time: | 2023-05-01 09:00:00.0 |
Satellites: | NOAA-20 |
Subject: | VIIRS Lunar Roll |
Impact: | data-unavailable |
Detail: | Lunar Calibration.The exact time will be announced closer to the day of the manoeuvre. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:54:59.0 |
Services: | CrIS Level 1 - JPSS ATMS Level 1 - JPSS VIIRS EDR - JPSS EARS-VIIRS SNPP - JPSS Copernicus data |
Type: | Planned Maintenance |
Ann Nr: | 9531 |
Rev: | 0 |
Start Time: | 2023-05-01 09:10:00.0 |
End Time: | 2023-05-04 10:30:00.0 |
Satellites: | NOAA-19 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | Due to maintenance, there will be no support for NOAA-19 from the EUMETSAT Svalbard Ground Station. Therefore NOAA-19 data for the listed orbits will not be acquired at Svalbard and will be unavailable on EUMETCast. |
Revision History: | |
Orbits: | 73334,73335,73338,73348,73349,73352,73363,73377 |
Status: | scheduled |
Issue Time: | 2023-04-26 14:52:39.0 |
Services: | AVHRR Level 1 - NOAA AMSU-A Level 1 - NOAA MHS Level 1 - NOAA HIRS Level 1 - NOAA ATOVS Sounding products - NOAA |
Type: | Planned Maintenance |
Ann Nr: | 9525 |
Rev: | 0 |
Start Time: | 2023-05-01 14:29:00.0 |
End Time: | 2023-05-01 14:36:00.0 |
Satellites: | Metop-C |
Subsystem: | ASCAT |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | ASCAT Gain Compression. Interruptions scheduled at provided times. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:30:20.0 |
Services: | ASCAT Level 1 - Metop-C ASCAT Soil Moisture - Metop-C EARS-ASCAT ASCAT AHRPT Metop-C OSI SAF - Products |
Type: | Planned Maintenance |
Ann Nr: | 9521 |
Rev: | 0 |
Start Time: | 2023-05-01 16:40:00.0 |
End Time: | 2023-05-01 17:41:00.0 |
Satellites: | GOES-16 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | NOAA has planned a quarterly FOV Mapping calibration for the GOES-16 space weather EXIS instrument. A EXIS and SUVI product outage can be expected in the given timeframe. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-25 14:06:53.0 |
Services: | GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 9532 |
Rev: | 0 |
Start Time: | 2023-05-02 07:00:00.0 |
End Time: | 2023-05-03 16:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-interruption |
Detail: | EARS Main Servers Relocation Activities. There is a risk of interruption to all EARS services in the following periods: 02-May-2023 07:00-16:00 UTC and 03-May-2023 07:00-16:00 UTC. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:50:40.0 |
Services: | EARS-ATOVS EARS-MWRI EARS-AVHRR EARS-ASCAT EARS-ATMS EARS-IASI EARS-CrlS EARS-VIIRS EARS-NWC EARS-VASS EARS-MERSI |
Type: | Planned Maintenance |
Ann Nr: | 9524 |
Rev: | 0 |
Start Time: | 2023-05-02 08:00:00.0 |
End Time: | 2023-05-02 15:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | data-delayed |
Detail: | Planned maintenance activity on EUMETView. During this time, image updates may be delayed for the Sentinel-3 layers |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:26:55.0 |
Services: | EUMETView |
Type: | Planned Maintenance |
Ann Nr: | 9526 |
Rev: | 0 |
Start Time: | 2023-05-02 08:52:00.0 |
End Time: | 2023-05-02 08:59:00.0 |
Satellites: | Metop-C |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:31:29.0 |
Services: | SEM L0 - Metop-C SEM AHRPT Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 9527 |
Rev: | 0 |
Start Time: | 2023-05-02 09:40:00.0 |
End Time: | 2023-05-02 09:47:00.0 |
Satellites: | Metop-B |
Subsystem: | SEM |
Component: | MEPED |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | SEM MEPED in flight calibration. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:32:25.0 |
Services: | SEM L0 - Metop-B SEM AHRPT Metop-B |
Type: | Planned Maintenance |
Ann Nr: | 9510 |
Rev: | 1 |
Start Time: | 2023-05-02 12:00:00.0 |
End Time: | 2023-05-02 16:00:00.0 |
Satellites: | GOES-16,GOES-18 |
Subject: | ground-segment-maintenance |
Impact: | data-unavailable |
Detail: | The date has been changed. The maintenance has been postponed to 2nd May 2023 |
Revision History: | [Original] Due to ground segment database maintenance at NOAA's Product Distribution and Access (PDA) System there will be a 4-hour outage of all GOES-EAST and GOES-WEST ABI, GLM, and Space Weather products on April 27, 2023, starting at 1200 UTC. |
Status: | scheduled |
Issue Time: | 2023-04-26 07:12:07.0 |
Services: | GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 9523 |
Rev: | 0 |
Start Time: | 2023-05-03 08:00:00.0 |
End Time: | 2023-05-03 15:00:00.0 |
Subject: | ground-segment-maintenance |
Impact: | risk-of-delay |
Detail: | Data Centre archive maintenance. During this time, catalogue updates may be delayed. Users are invited to check out the Data Store (https://data.eumetsat.int/) |
Revision History: | |
Url: | https://www.eumetsat.int/data-centre-ordering-faq |
Status: | scheduled |
Issue Time: | 2023-04-26 10:44:58.0 |
Services: | EUMETSAT Data Centre |
Type: | Planned Maintenance |
Ann Nr: | 9519 |
Rev: | 0 |
Start Time: | 2023-05-03 10:50:00.0 |
End Time: | 2023-05-03 11:00:00.0 |
Satellites: | GOES-16 |
Subject: | instrument-calibration |
Detail: | A GOES-16 ABI solar calibration scan is planned on 3 May 2023. Between 10:50 and 10:55 UTC GOES-16 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G16_s20231231050[SSS]_e20231231055[SSS]_c202312310[mmssSSS]-118900_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 11:00 UTC |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-25 11:46:41.0 |
Services: | GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 9520 |
Rev: | 0 |
Start Time: | 2023-05-03 16:00:00.0 |
End Time: | 2023-05-03 16:10:00.0 |
Satellites: | GOES-16 |
Subject: | instrument-calibration |
Detail: | A GOES-16 ABI routine desert monitoring calibration scan is planned on 3 May 2023 from 16:00 UTC o 16:05 UTC. Between 16:05 UTC and 16:10 UTC GOES-16 ABI will operate in Continuous Full Disk Mode (mode 4) instead of 10-minute Flex Mode (mode 6). Filenames will change to reflect the mode 4 operations, e.g.: OR_ABI-L1b-RadF-M4C01_G16_s20231231605[SSS]_e20231231610[SSS]_c202312316[mmssSSS]-118900_0.nc. ABI 10-minute Flex Mode (Mode 6) will resume at 16:10 UTC |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-25 11:49:35.0 |
Services: | GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 9522 |
Rev: | 0 |
Start Time: | 2023-05-03 16:25:00.0 |
End Time: | 2023-05-03 18:08:00.0 |
Satellites: | GOES-16 |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | NOAA has planned a quarterly cruciform scan calibration for the GOES-16 space weather EXIS instrument. A EXIS and SUVI product outage can be expected in the given timeframe. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-25 14:08:26.0 |
Services: | GOES Products |
Type: | Planned Maintenance |
Ann Nr: | 9462 |
Rev: | 1 |
Start Time: | 2023-05-04 09:44:00.0 |
End Time: | 2023-05-04 11:21:00.0 |
Satellites: | Metop-C |
Subsystem: | GRAS |
Subject: | general-announcement |
Impact: | data-unavailable |
Detail: | Event times have been updated. |
Revision History: | [Original] GRAS receiver software update. More accurate times will be provided closer to the start of the activity. |
Status: | scheduled |
Issue Time: | 2023-04-26 14:28:14.0 |
Services: | GRAS Level 1 - Metop-C |
Type: | Planned Maintenance |
Ann Nr: | 9528 |
Rev: | 0 |
Start Time: | 2023-05-05 09:06:00.0 |
End Time: | 2023-05-05 09:08:00.0 |
Satellites: | Sentinel-3B |
Subsystem: | OLCI |
Subject: | instrument-calibration |
Impact: | data-unavailable |
Detail: | |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:33:01.0 |
Services: | OLCI Level 1 Products - S3B OLCI Level 2 Marine Products - S3B |
Type: | Planned Maintenance |
Ann Nr: | 9530 |
Rev: | 0 |
Start Time: | 2023-05-06 04:52:00.0 |
End Time: | 2023-05-06 05:44:00.0 |
Satellites: | Sentinel-3A |
Subject: | spacecraft-special-operation |
Impact: | data-degraded |
Detail: | During the OLCI lunar observation the following NRT products are subject to degradation during the times listed: OLCI - 05:37 to 05:44; SLSTR IR Channels 04:52 to 05:43; SLSTR VIS Channels - 05:25 to 05:43. SRAL NRT products are subject to be degraded and gaps can be experienced from sensing times 2023-05-06T03:56 to 2023-05-06T07:20. SRAL STC and NTC production gaps for sensing times2023-05-06T02:14 to 2023-05-06T07:20 (RON[1-385] 261 to 263) are expected. |
Revision History: | |
Status: | scheduled |
Issue Time: | 2023-04-26 14:40:11.0 |
Services: | SLSTR Level 1 Products - S3A OLCI Level 1 Products - S3A OLCI Level 2 Marine Products - S3A SLSTR Level 2 Marine Products - S3A SRAL Level 2 Marine Products - S3A SLSTR Level 2 Atmospheric Products - S3A SRAL Level 1 Products - S3A |
Type: | Planned Maintenance |
Ann Nr: | 9497 |
Rev: | 2 |
Start Time: | 2023-05-08 14:00:00.0 |
End Time: | 2023-05-09 00:00:00.0 |
Satellites: | Metop-B |