Topic: Weekly Operations Schedule - Week 27


Date/Time Issued: June 29, 2023 1554Z

 

Product(s) or Data Impacted: See list below.

Date/Time of Initial Impact: June 29, 2023 1554Z 


Date/Time of Expected End:  
See list below

Details/Specifics of Change:


Message number:10732
Message creation:Thu Jun 29 15:48:25 UTC 2023


Type:Planned Maintenance
Ann Nr:9204
Rev:0
Start Time:2023-01-31 09:39:00.0
Satellites:Sentinel-3B
Subsystem:SRAL
Subject:instrument-calibration
Impact:data-degraded
Detail:Starting 31/01/2023 09:39:49 S3B will start performing SRAL external calibrations over a transponder site in Leonessa. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.27 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 306 - from cycle 75 (inclusive) onwards.
Revision History:
Status:scheduled
Issue Time:2023-01-25 17:19:20.0
Services:SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B

Type:Planned Maintenance
Ann Nr:9205
Rev:0
Start Time:2023-02-02 10:28:00.0
Satellites:Sentinel-3B
Subsystem:SRAL
Subject:instrument-calibration
Impact:data-degraded
Detail:Starting 02/02/2023 10:28:30 S3B will start performing SRAL external calibrations over a corner reflector site in Spain. To conduct this pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.26 seconds over the transponder location (42.052°N, 0.7300° E) for all relative orbits number (RON) 335 - from cycle 75 (inclusive) onwards
Revision History:
Status:scheduled
Issue Time:2023-01-25 17:19:08.0
Services:SRAL Level 1 Products - S3B
SRAL Level 2 Marine Products - S3B

Type:Planned Maintenance
Ann Nr:9258
Rev:0
Start Time:2023-02-14 20:35:00.0
Satellites:Sentinel-3A
Subsystem:SRAL
Subject:instrument-calibration
Impact:data-degraded
Detail:Starting 14/02/2023 20:35:57 S3A will start performing SRAL external calibrations over a transponder in Leonessa, Italy. To conduct this transponder pass, the on-board Digital Elevation Model (DEM) altitude value must be temporarily updated in RAM, and is reverted immediately after the pass. A short outage immediately before and after the pass will be introduced, and data should be considered degraded as per non-nominal acquisition mode, for a total duration of approx.28 seconds over the transponder location (42.61607° N, 13.03780° E) for all relative orbits number (RON) 270 from cycle 95 (inclusive) onwards
Revision History:
Status:scheduled
Issue Time:2023-02-08 09:22:43.0
Services:SRAL Level 1 Products - S3A
SRAL Level 2 Marine Products - S3A

Type:Service Enhancement
Ann Nr:9420
Rev:0
Start Time:2023-03-20 15:00:00.0
End Time:2023-09-21 15:00:00.0
Satellites:MET-9
Subject:general-announcement
Detail:From 20/03/2023, the daily Meteosat-9 Upper HRV Window shift time will change from 14:00 UTC to 15:00 UTC to better optimise the illumination for the Spring/Summer season. The 15:00 UTC shift time will remain in place until 21 September 2023 included.
Revision History:
Status:scheduled
Issue Time:2023-03-17 08:52:52.0
Services:IODC Meteosat Meteorological Products
IODC SEVIRI Level 1.5 Image Data

Type:Service Enhancement
Ann Nr:9447
Rev:0
Start Time:2023-04-12 09:00:00.0
Subject:service-change
Detail:Data access from the Data Centre is being migrated to the Data Store, for easier and faster access. For full details, see the URL provided below.
Revision History:
Url:https://www.eumetsat.int/transition-data-centre-data-store
Issue Time:2023-03-29 13:44:49.0
Services:EUMETSAT Data Centre

Type:Service Enhancement
Ann Nr:9749
Rev:0
Start Time:2023-06-01 09:00:00.0
End Time:2023-06-01 09:00:00.0
Subject:general-announcement
Detail:The generation of MODIS ocean colour and sea surface temperature products by PML (Plymouth Marine Laboratory) has stopped. These products are, therefore, no longer distributed on EUMETCast.
Revision History:
Issue Time:2023-06-28 14:07:54.0
Services:Misc

Type:Planned Maintenance
Ann Nr:9747
Rev:0
Start Time:2023-07-03 19:55:00.0
End Time:2023-07-03 20:47:00.0
Satellites:Sentinel-3A
Subject:spacecraft-special-operation
Impact:data-degraded
Detail:During the OLCI lunar observation the following NRT products are subject to degradation during the times listed: OLCI - 20:40 to 20:47; SLSTR IR Channels 20:28 to 20:47; SLSTR VIS Channels - 19:55 to 20:47. SRAL NRT products are subject to be degraded and gaps can be experienced from sensing times 2023-07-03T18:58 to 2023-07-03T20:38. SRAL STC and NTC production gaps for sensing times 2023-07-03T17:18 to 2023-07-03T22:19 (RON[1-385] 327 to 329) are expected.
Revision History:
Status:scheduled
Issue Time:2023-06-28 11:15:31.0
Services:OLCI Level 1 Products - S3A
SLSTR Level 2 Marine Products - S3A
OLCI Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3A
SLSTR Level 2 Atmospheric Products - S3A
SRAL Level 1 Products - S3A
SRAL Level 2 Marine Products - S3A

Type:Planned Maintenance
Ann Nr:9752
Rev:0
Start Time:2023-07-04 08:48:00.0
End Time:2023-07-04 08:55:00.0
Satellites:Metop-C
Subsystem:SEM
Component:MEPED
Subject:instrument-calibration
Impact:data-unavailable
Detail:SEM MEPED in flight calibration.
Revision History:
Status:scheduled
Issue Time:2023-06-28 14:38:52.0
Services:SEM L0 - Metop-C
SEM AHRPT Metop-C

Type:Planned Maintenance
Ann Nr:9751
Rev:0
Start Time:2023-07-04 09:36:00.0
End Time:2023-07-04 09:43:00.0
Satellites:Metop-B
Subsystem:SEM
Component:MEPED
Subject:instrument-calibration
Impact:data-unavailable
Detail:SEM MEPED in flight calibration.
Revision History:
Status:scheduled
Issue Time:2023-06-28 14:36:36.0
Services:SEM L0 - Metop-B
SEM AHRPT Metop-B

Type:Planned Maintenance
Ann Nr:9728
Rev:1
Start Time:2023-07-05 07:00:00.0
End Time:2023-07-05 15:30:00.0
Subject:ground-segment-maintenance
Impact:risk-of-interruption
Detail:Activity postponed, start and end times have been updated.
Revision History:[Original] EARS Main Server Calibration update for MERSI products. There is a risk of interruption to all EARS-MERSI services from satellite FY3D in the listed period.
Status:scheduled
Issue Time:2023-06-28 14:42:54.0
Services:EARS-MERSI

Type:Planned Maintenance
Ann Nr:9746
Rev:0
Start Time:2023-07-05 07:40:00.0
End Time:2023-07-05 07:51:00.0
Satellites:Sentinel-3A
Subject:in-plane-manoeuvre
Impact:data-degraded
Detail:Reduced data quality should be expected for data sensed during this period.
Revision History:
Status:scheduled
Issue Time:2023-06-28 11:05:10.0
Services:SLSTR Level 2 Marine Products - S3A
SLSTR Level 1 Products - S3A
SLSTR Level 2 Atmospheric Products - S3A
SRAL Level 1 Products - S3A
SRAL Level 2 Marine Products - S3A

Type:Planned Maintenance
Ann Nr:9750
Rev:0
Start Time:2023-07-06 05:12:00.0
End Time:2023-07-06 09:12:00.0
Satellites:Metop-B
Subsystem:IASI
Subject:instrument-calibration
Impact:data-unavailable
Detail:External Calibration
Revision History:
Status:scheduled
Issue Time:2023-06-28 14:35:07.0
Services:EARS-IASI
IASI Sounding Products - Metop-B
IASI Level 1 - Metop-B
IASI AHRPT Metop-B
OSI SAF - Products

Type:Planned Maintenance
Ann Nr:9753
Rev:0
Start Time:2023-07-06 22:00:00.0
End Time:2023-07-07 02:00:00.0
Subject:ground-segment-maintenance
Impact:risk-of-interruption
Detail:EARS Maspalomas PCCW Data Line Maintenance. There may be disruption to the listed EUMETSAT based services.
Revision History:
Status:scheduled
Issue Time:2023-06-28 14:48:20.0
Services:EARS-MWRI
EARS-ATOVS
EARS-AVHRR
EARS-ATMS
EARS-VIIRS
EARS-CrlS
EARS-ASCAT
EARS-IASI
EARS-NWC
EARS-VASS
EARS-MERSI

Type:Planned Maintenance
Ann Nr:9745
Rev:0
Start Time:2023-07-10 08:00:00.0
End Time:2023-07-14 16:00:00.0
Subject:ground-segment-maintenance
Impact:risk-of-delay
Detail:Data Centre archive maintenance. During this time, the processing of MSG and Metop orders will be delayed. Users are invited to check out the Data Store (https://data.eumetsat.int/).
Revision History:
Url:https://eumetsatspace.atlassian.net/wiki/spaces/EUM/blog/2023/03/22/1965359114/Switching+the+data+access+from+the+Data+Centre+to+the+Data+Store+for+faster+delivery+times.#Reduction-of-the-Data-Centre-products-customisation-offer
Status:scheduled
Issue Time:2023-06-27 12:38:54.0
Services:EUMETSAT Data Centre

Type:Service Enhancement
Ann Nr:9537
Rev:1
Start Time:2023-07-20 09:00:00.0
End Time:2023-07-21 17:00:00.0
Subject:general-announcement
Detail:The migration is now scheduled to take place between 20 and 21 July 2023, with exact time to be announced in due course.
Revision History:[Original] EUMETCast Europe Prime Satellite will be migrated from Eutelsat-10A to Eutelsat-10B. The migration is scheduled to take place between 18 and 20 July 2023, with exact date to be announced in due course. For full details, see the URL provided below.
Url:https://www.eumetsat.int/change-eumetcast-europe-prime-satellite
Issue Time:2023-06-14 14:11:07.0
Services:EUMETCast-Europe

Type:Service Enhancement
Ann Nr:9730
Rev:1
Start Time:2023-09-11 09:00:00.0
End Time:2023-09-11 09:00:00.0
Subject:general-announcement
Detail:Change of date from 31 July to 11 September 2023.
Revision History:[Original] The EUMETCast Terrestrial service will undergo reorganisation on 31 July 2023. This change is intended to optimise the bandwidth usage on the service. For full details, see the URL provided below.
Url:https://www.eumetsat.int/eumetcast-terrestrial-reorganisation
Issue Time:2023-06-29 13:05:36.0
Services:EUMETCast-Terrestrial

Type:Service Enhancement
Ann Nr:9748
Rev:0
Start Time:2023-09-12 09:00:00.0
End Time:2023-09-12 09:00:00.0
Subject:general-announcement
Detail:The distribution of two IODC H SAF Precipitation products on EUMETCast Africa will be stopped on 12 September 2023. The products are: H63 'Precipitation rate at ground by GEO/IR supported by LEO/MW - IODC' and H90 'Accumulated Precipitation at ground by blended MW and IR - IODC'. This is due to EUMETCast Africa bandwidth considerations.
Revision History:
Issue Time:2023-06-28 13:51:44.0
Services:H-SAF - Products

Name:EUMETSAT
Address:Eumetsat-Allee 1
D-64295 Darmstadt
Germany
Telephone:+49 6151 807 3660/3770
Fax:+49 6151 807 3790
E-mail:ops@eumetsat.int
Internet:www.eumetsat.int

You are receiving this email because you are subscribed to our User Notification Service (UNS). You can modify your UNS subscriptions or unsubscribe at any time via our UNS web interface (login to our Earth Observation Portal required).

Any email message from EUMETSAT is sent in good faith but shall neither be binding nor construed as constituting a commitment by EUMETSAT, except where provided for in a written agreement or contract or if explicitly stated in the email. Please note that any views or opinions presented in this email are solely those of the sender and do not necessarily represent those of EUMETSAT. This message and any attachments are intended for the sole use of the addressee(s) and may contain confidential and privileged information. Any unauthorised use, disclosure, dissemination or distribution (in whole or in part) of its contents is not permitted. If you received this message in error, please notify the sender and delete it from your system.