NOAA Office of Satellite and Product Operations

Please Note:  

Update 7/10/2020: GOES-15 supplemental operations will begin on Sunday, August 9, 2020 at 0000 UTC and continue through Thursday, September 3, 2020 1600 UTC. See notification for more details.

To view imagery from the operational GOES East (GOES-16) and GOES West (GOES-17) satellites, users may visit https://www.star.nesdis.noaa.gov/goes/.

NOAA 19 ADACS Subsystem Summary

Component Description Status
ESAEarth Sensor AssemblyGreen
MIMU-1Miniature Inertial Measurement Unit -1Green
MIMU-2Miniature Inertial Measurement Unit -2Green
PTC 1APitch Torque Coil 1AGreen
PTC 1BPitch Torque Coil 1BGreen
PTC 2APitch Torque Coil 2AGreen
PTC 2BPitch Torque Coil 2BGreen
RWA SSkew Reaction Wheel AssemblyGreen
RWA XX-axis Reaction Wheel AssemblyGreen
RWA YY-axis Reaction Wheel AssemblyGreen
RWA ZZ-axis Reaction Wheel AssemblyGreen
RYTC 1ARoll-Yaw Torque Coil 1AGreen
RYTC 1BRoll-Yaw Torque Coil 1bGreen
RYTC 2ARoll-Yaw Torque Coil 2AGreen
RYTC 2BRoll-Yaw Torque Coil 2BGreen
SSASun Sensor AssemblyGreen


Subsystem History:

Date Time Component Description
09/28/201615:09:35 Enable gas and automatic thruster firing.
09/28/201615:02:51 Disable gas and automatic thruster firing.
10/20/201514:48:22 Enable gas and automatic thruster firing.
10/20/201514:44:35 Disable gas and automatic thruster firing.
07/15/201516:06:57SSAAdjust Sun Sensor Calibration to correct for a +0.35 deg error in Yaw.
12/18/201414:54:36 Enable gas and automatic thruster firing.
12/18/201414:49:00 Disable gas and automatic thruster firing.
11/25/201417:14:38 Enable gas and automatic thruster firing.
11/25/201417:11:42 Disable gas and automatic thruster firing.
10/07/200917:13:00 Extract MIMU LIM data to CPUTLM7
10/07/200914:06:00 Extract MIMU LIM data to CPUTLM7
06/04/200915:15:00 Enables Auto Thruster Firings for both CPUs
06/04/200915:14:00 Change gas unloading threshold for pitch axis momentum from 40 in/lbs/sec to 45 in/lbs/sec for both CPUs before enabling auto thruster firings
05/27/200913:17:00 Update Quadrant 1 A & B Detector Biases.
02/06/200911:49:20ESAADACS Subsystem Nominal
02/06/200911:49:20MIMU-1ADACS Subsystem Nominal
02/06/200911:49:20MIMU-2ADACS Subsystem Nominal
02/06/200911:49:20PTC 1AADACS Subsystem Nominal
02/06/200911:49:20PTC 1BADACS Subsystem Nominal
02/06/200911:49:20PTC 2AADACS Subsystem Nominal
02/06/200911:49:20PTC 2BADACS Subsystem Nominal
02/06/200911:49:20RWA SADACS Subsystem Nominal
02/06/200911:49:20RWA XADACS Subsystem Nominal
02/06/200911:49:20RWA YADACS Subsystem Nominal
02/06/200911:49:20RWA ZADACS Subsystem Nominal
02/06/200911:49:20RYTC 1AADACS Subsystem Nominal
02/06/200911:49:20RYTC 1BADACS Subsystem Nominal
02/06/200911:49:20RYTC 2AADACS Subsystem Nominal
02/06/200911:49:20RYTC 2BADACS Subsystem Nominal
02/06/200911:49:20SSAADACS Subsystem Nominal