NOAA Office of Satellite and Product Operations

Please Note:  

GOES-15 supplemental operations ended on March 2, 2020. The distribution of GOES-15 satellite products has been discontinued.

To view imagery from the operational GOES East (GOES-16) and GOES West (GOES-17) satellites, users may visit https://www.star.nesdis.noaa.gov/goes/.

SNPP EPDS Subsystem Summary

Component Description Status
B1Battery #1Green
B2Battery #2Green
BCC1Battery #1 Conditioning Circuit Green
BCC2Battery #2 Conditioning CircuitGreen
DSEPDistribution and Support Electronics PackageGreen
ESBEssential BusGreen
HZBHazard BusGreen
NEBNon-Essential BusGreen
PLBPayload BusGreen
PUMAPower Usage and Management AssemblyGreen
RDARotational Drive AssemblyGreen
RDERotational Drive ELectronicsGreen
RRSRetain and Release SubsystemGreen
SASolar ArrayGreen
SMBSafe Mode BusGreen
SMCASurvival Mode Configuration AssemblyGreen


Subsystem History:

Date Time Component Description
05/01/201412:00:00 SNPP became Prime PM Mission.
05/01/2014B1SNPP became Prime PM Mission
05/01/2014B2SNPP became Prime PM Mission
05/01/2014BCC1SNPP became Prime PM Mission
05/01/2014BCC2SNPP became Prime PM Mission
05/01/2014DSEPSNPP became Prime PM Mission
05/01/2014ESBSNPP became Prime PM Mission
05/01/2014HZBSNPP became Prime PM Mission
05/01/2014NEBSNPP became Prime PM Mission
05/01/2014PLBSNPP became Prime PM Mission
05/01/2014PUMASNPP became Prime PM Mission
05/01/2014RDASNPP became Prime PM Mission
05/01/2014RDESNPP became Prime PM Mission
05/01/2014RRSSNPP became Prime PM Mission
05/01/2014SASNPP became Prime PM Mission
05/01/2014SMBSNPP became Prime PM Mission
05/01/2014SMCASNPP became Prime PM Mission