The following messages give you information about NOAA's satellite operations,
including various product changes, upgrades and outages.
Visit often for the latest information affecting data delivery.
      2019         1   2   3   4   5   6   7   8   9   10   11   12   |       2020         1   2   3   4   5   6   7   8   9   10   11   12   |       2021         1   2   3   4   5   6   7   8   9   10   11   12   |       2022         1   2   3   4   5   6   7   8   9   10   11   12   |       2023         1   2   3   4   5   6   7   8   9   10   11   12   |       2024         1   2   3   4   5   6   7   8   9   |
This page shows the 100 most recent messages. To view older messages, please choose the year and month from the menu above.
Product Outage/Anomaly: JPSS NPP SMD Data Delay REV 48410: Issued March 1, 2021 1259Z
Product Outage/Anomaly: JPSS N20 SMD Data Delay REV 17014: Issued March 1, 2021 1356Z
Anomaly: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF CBU site, March 01, 2021 1510Z
Product Outage/Anomaly: (Update#1) JPSS NPP SMD Data Delay REV 48410: Issued March 1, 2021 1532Z
Product Outage/Anomaly: (Update #1) JPSS N20 SMD Data Delay REV 17014: Issued March 1, 2021 1537Z
Anomaly: Update#1 Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF CBU site, March 01, 2021 1552Z
Administrative : Missing PDA Data - Issued: March 01, 2021 1736Z
Administrative: Transition of NSOF Operations from CBU-String to A-String 3/3/21- Issued: March 01, 2021 2200Z
Product Outage/Anomaly: JPSS GCOM-W1 SMD Data Delay REV 46746: Issued March 1, 2021 2228Z
Product Outage/Anomaly: JPSS N20 SMD Data Delay REV 17019: Issued March 1, 2021 2237Z
Product Outage/Anomaly: NPP Data Delay all products: Issued March 02, 2021 0124Z
SARSAT Outage/Anomaly GU1 and GU2 LEO Ground Station Offline, Issued: March 02, 2021 0858Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 02, 2021: Issued: March 02, 2021 0910Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site - Issued: March 2nd, 2021 1300Z
SARSAT Outage/Anomaly (Update #1): GU1 and GU2 LEO Ground Station Offline, Issued: March 02, 2021 1306Z
SARSAT Outage/Anomaly (Update #2): GU1 and GU2 LEO Ground Station Offline, Issued: March 02, 2021 1340Z
Administrative: Eumetsat Weekly Operations Schedule - Week 9 Issue 3 ( Addition of announcement 6758) Issued: March 02, 2021 1515Z
Product Outage/Anomaly: N20 Data Delay Issued: March 02, 2021 1706Z
Administrative: Planned System Upgrade To Cause Delay in Processing for Ocean Color Products scheduled for March 3, 2021, Issued: March 2, 2021 2143 UTC
Administrative: Planned Maintenance Impacting ESPC Polarprod Server Scheduled on March 3, 2021 - Issued: March 2, 2021 2145Z
Product Outage/Anomaly: DMSP SSMI/S Data lost - Issued March 3, 2021 0450Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 03, 2021: Issued: March 03, 2021 0903Z
SARSAT Outage/Anomaly Update #3-Final Update: GU1 and GU2 LEO Ground Station Offline, Issued: March 03, 2021 1005Z
SARSAT Outage/Anomaly: GU1 LEO Ground Station Offline, Issued: March 03, 2021 1252Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF CBU site, Issued: March 03, 2021 1434Z
Administrative: Update #1 Transition of NSOF Operations from CBU-String to A-String 3/3/21 - Issued: March 3, 2021 1457Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 03, 2021: Issued: March 03, 2021 1627Z
Administrative: Update #5 - Microwave Surface and Precipitation Products System(MSPPS) Retirement rescheduled to March 4, 2021 - Issued March 3, 2021 1815 UTC
Product OUTAGE/DELAY: GCOM - Issued: March 03, 2021 1938Z
Administrative: Update #1 - Termination of AMSR2 Sea Ice GRIB2 Product rescheduled to March 22, 2021 - Issued: March 3, 2021 2015 UTC
Product Outage/Anomaly: SNWS snow depth data/Mesh 16 file loss Issued: March 03, 2021 2028Z
Product OUTAGE/DELAY: Update #1 GCOM - Issued: March 03, 2021 2106Z
Administrative: JPSS - Transition of NSOF Operations From CBU to A-String 030321 ***Completed*** - Issued: March 03, 2021 2141Z
Administrative: Correction:GOES-16 MDS Request for Meso-2 Scheduled for March 03, 2021: Issued: March 04, 2021 0011Z
Product Outage/Anomaly: NPP Partial SMD Data Delay SVL REV 48445 - Issued March 04, 2021 0027Z
Product Outage/Anomaly: F-18 GAC Data Delay- Issued March 04, 2021 0222Z
Product Outage/Anomaly: Update #1 - F-18 GAC Data Delay- Issued March 04, 2021 0526Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule_Issued:_March 4, 2021_1555 UTC
Administrative: Eumetsat Weekly Operations Schedule Week 10 Issued: March 04, 2021 1620Z
Product Outage: OMI data outage for March 05, 2021 - Issued: March 04, 2021 1818Z
Product Outage: GOES-16 - ABI L1b All Bands, Cloud and Moisture All Bands products delivered to GRB, PDA - Issued: March 04, 2021 1825Z
Administrative: Critical Weather Day has been declared for March 04, 2021, Issued: March 04, 2021 2045Z
Administrative: Final Update: Critical Weather Day has been declared for March 04, 2021, Issued: March 04, 2021 2248Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 05, 2021: Issued: March 05, 2021 1243Z
Administrative: GOES-14/15/16/17 Spring 2021 Solar RFI predicted times are now available - Issued March 5, 2021 1830
Administrative: Update #1- Planned Maintenance Impacting ESPC Polarprod Server Scheduled on March 8, 2021 - Issued: March 5, 2021 1845Z
Administrative: Update #1 - Planned System Upgrade To Cause Delay in Processing for Ocean Color Products scheduled for March 3, 2021, Issued: March 5, 2021 1926 UTC
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 06, 2021: Issued: March 06, 2021 0600Z
Administrative: Correction: GOES-16 MDS Request for Meso-2 Scheduled for March 06, 2021: Issued: March 06, 2021 1141Z
Administrative: Alert Message 2021-03-07 03:43:36 : RDS-EARS- Issued March 7, 2021 0357Z
Administrative: Alert Message 2021-03-07 09:06:52 : RDS-EARS- Issued March 7, 2021 0909Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 07, 2021: Issued: March 07, 2021 1230Z
Product Outage/Anomaly: Monterey HRPT HIPS Data Delay- Issued March 07, 2021 1941Z
Product Outage/Anomaly: Ford Island HRPT Data Delay - Issued: March 07, 2021 2053Z
Product Outage/Anomaly: Data transfer Issue resulting in product outage - Issued March 07, 2021 2200Z
Product Outage/Anomaly: Update #1, Monterey HRPT HIPS Data Delay- Issued March 07, 2021 2226Z
Product Outage/Anomaly: Update #1, Ford Island HRPT Data Delay - Issued: March 07, 2021 2235Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 08, 2021: Issued: March 08, 2021 1420Z
Administrative: Eumetsat Weekly Operations Schedule Week 10 Issue 2 (Announcements: Addition of 6778) Issued: March 8, 2021 1520Z
Administrative: Eumetsat Weekly Operations Schedule Week 10 Issue 3 (Announcements: Update of 6778) Issued: March 8, 2021 1528Z
Administrative: GOES-16 ABI solar calibration scan scheduled for March 15, 2021, Issued: March 8,2021 1658Z
Administrative: GOES-16 ABI desert monitoring calibration scan scheduled for March 15, 2021, Issued: March 8, 2021 1755Z
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 09, 2021- Issued: March 09, 2021 0812Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 09, 2021: Issued: March 09, 2021 1310Z
SARSAT Outage/Anomaly: Florida 3 LEO Ground Station Offline, Issued: March 09, 2021 1320Z
SARSAT Outage/Anomaly: Update #1 - Florida 3 LEO Ground Station Offline, Issued: March 09, 2021 1403Z
Administrative: Update #1 - GOES-16 MDS Request for Meso-2 Scheduled for March 09, 2021: Issued: March 09, 2021 1536Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 09, 2021: Issued: March 09, 2021 1616Z
Administrative: NOAA-18, 19, MetOp-A/2, MetOp-B/1, & MetOp-C/3 AVHRR, Monthly Visible Calibration Update, 9 March 2021 - Issued: 9 March 2021 1700 UTC
Administrative: Legacy Production Environment System Downtime Scheduled for March 10, 2021 at 1500Z - Issued: March 9, 2021 1852Z
Administrative: Critical Weather Day has been declared for March 11, 2021, Issued: March 09, 2021 1943Z
Administrative: GOES-16 (EAST) Geostationary Lightning Mapper Test on March 16, 2021 - Issued March 09, 2021 2055 UTC
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 10, 2021: Issued: March 10, 2021 1013Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 10, 2021: Issued: March 10, 2021 1131Z
Administrative: Update #1 - GOES-16 MDS Request for Meso-2 Scheduled for March 10, 2021: Issued: March 10, 2021 1333Z
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 10, 2021- Issued: March 10, 2021 1714Z
Product Outage/Anomaly: NPP contact 48540 Data Delayed: Issued March 10, 2021 18338Z
Product Anomaly: GOES-17 ABI L1b Full Disk and derived products delivered to AWIPS, GRB, PDA: Issued March 10, 2021 2048Z
Product Outage/Anomaly: Update#1 NPP contact 48540 Data Delayed: Issued March 10, 2021 2153Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_March 11, 2021_1400 UTC
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_March 11, 2021_1409Z
Administrative: Eumetsat Weekly Operations Schedule Week 11 Issued: March 11, 2021 1600Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 12, 2021- Issued: March 12, 2021 1300Z
SARSAT Outage/Anomaly: SARSAT S13 (METOP-B) LEO Satellite SARP Problem - Issued: March 12, 2021 1426Z
Administrative: Eumetsat Weekly Operations Schedule - Week 11 Issue 2 (Announcements: Update of 6791) Issued: March 12, 2021 1457Z
Product Outage/Anomaly: GOES-17 ABI Meso-2 and derived products delivered to AWIPS, GRP, PDA - Issued: March 12, 2021 1525Z
Product Outage/Anomaly: GOES-16 ABI Meso-2 and derived products delivered to AWIPS, GRP, PDA - Issued: March 12, 2021 1530Z
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 12, 2021- Issued: March 12, 2021 1755Z
SARSAT Outage/Anomaly: Update #1: SARSAT S13 (METOP-B) LEO Satellite SARP Problem, Issued: March 12, 2021 2251Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 13, 2021- Issued: March 13, 2021 1403Z
Administrative: Update#1 Critical Weather Day has been declared for March 11, 2021, Issued: March 13, 2021 1425Z
Administrative: Update#1 Critical Weather Day has been declared for March 11, 2021 - Issued: March 14, 2021 1208Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 14, 2021- Issued: March 14, 2021 1658Z
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 14, 2021- Issued: March 14, 2021 2220Z
Product Outage/Anomaly: Jason-3 rev 24121 Issued: March 15, 2021 0347Z
Product Outage/Anomaly: Jason-3 rev 24123 Issued: March 15, 2021 0558Z
Product Outage/Anomaly: Jason-3 rev 24124 Issued: March 15, 2021 0728Z
Product Outage/Anomaly: Data Delay Jason-3 Error Issued: March 15, 2021 0744Z
Product Outage/Anomaly: Update #1 Data Delay Jason-3 Error Issued: March 15, 2021 0847Z
Product Outage: GOES-16 - ABI L1b All Bands products delivered to AWIPS, GRB, PDA - Issued: March 15, 2021 1258Z
Administrative: Update #3: Critical Weather Day has been declared for March 11, 2021 - Issued: March 15, 2021 1318Z
Administrative: GOES-17 ABI Solar Calibration Scan scheduled for March 26, 2021, Issued: March 15, 2021 1413Z
Administrative: GOES-17 ABI Desert Monitoring Calibration Scan scheduled for March 26, 2021, Issued: March 15, 2021 1415Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 15, 2021- Issued: March 15, 2021 1432Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 15, 2021- Issued: March 15, 2021 1433Z
Administrative: Eumetsat Weekly Operations Schedule - Week 11 Issue 3 (Announcements: Addition of 6797) Issued: March 15, 2021 1613Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 16, 2021- Issued: March 16, 2021 0709Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 16, 2021- Issued: March 16, 2021 0715Z
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 16, 2021- Issued: March 16, 2021 0722Z
Administrative: Eumetsat Weekly Operations Schedule - Week 11 Issue 4 (Announcements: Addition of 6799) Issued: March 16, 2021 1105Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, March 16th, 2021 1322Z
Administrative: Critical Weather Day has been declared for March 17, 2021 - Issued: March 16, 2021 1440Z
Product Anomaly: GOES-16 - ABI L1b Bands 01, 02, 05, Cloud and Moisture Bands 02, 04, 06-16 products delivered to PDA -Issued: March 16, 2021 1555Z
Administrative: Update#1 Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, March 16th, 2021 1604Z
Administrative: Update#2 Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, Issued: March 16th, 2021 1626Z
Administrative: Update #1 - JPSS Algorithm Updates in IDPS Block 2.3 Maintenance Release Mx 1 Transition to Operations scheduled for March 30, 2021, Issued: March 16, 2021 1742 UTC
Administrative: GCOM-W1 Orbit Adjust Maneuver3/17/21, Issued: March 16, 2021 2211Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 17, 2021- Issued: March 17, 2021 1040Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 17, 2021- Issued: March 17, 2021 1045Z
Administrative: CORRECTION: GOES-16 MDS Request for Meso-2 Scheduled for March 17, 2021- Issued: March 17, 2021 1106Z
Administrative: UPDATE #1: GOES-16 (EAST) Geostationary Lightning Mapper Test on March 16, 2021 - Issued March 17, 2021 1139Z
Product Outage/Anomaly: NOAA-19 Data Issued: March 17, 2021 1151Z
Administrative: Eumetsat Weekly Operations Schedule - Week 11 - Issue 5 (update of announcement 6784) Issued: March 17, 2021 1423Z
Administrative: Eumetsat Weekly Operations Schedule - Week 11 Issue 6 (Announcements: Addition of 6802) Issued: March 17, 2021 1558Z
Administrative: N20 Inclination Adjustment Maneuver (IAM) scheduled for March 18, 2021, Issued: March 17, 2021 1739Z
Product Outage: GOES-16 ABI L1b All Bands products delivered to AWIPS, GRB, PDA - Issued: Mar 17, 2021 1944Z
Administrative_Alert Message 2021 Issued: March 18, 2021 1110Z
Administrative: GOES-16/17 Software Patch (EI.22.00) and COSI 2.4.0 on March 23, 2021, Issued: March 18, 2021 1235 UTC
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 18, 2021- Issued: March 18, 2021 1405Z
Product Outage Anomaly Alert Message 2021 Service Issued: March 18, 2021 1454Z
Administrative: Eumetsat Weekly Operations Schedule - Week 12 Issued: March 18, 2021 1605Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule_Issued:_March 18, 2021_1605 UTC
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 18, 2021- Issued: March 18, 2021 1752Z
Administrative: Update #4: Critical Weather Day has been declared for March 11, 2021 - Issued: March 15, 2021 1209Z
Administrative Update #1: Critical Weather Day has been declared for March 17, 2021 - Issued: March 16, 2021 1440Z
Administrative: Update #2 - Termination of AMSR2 Sea Ice GRIB2 Product rescheduled to March 22, 2021 - Issued: March 19, 2021 1617 UTC
Product Outage/Anomaly: NOAA-19 GAC Loss Data - Issued: March 19, 2021 2008Z
Product Outage/Anomaly Update #1: NOAA-19 GAC Loss Data - Issued: March 19, 2021 2044Z
Product Outage: GOES-16 - ABI L1b All Bands, Cloud and Moisture All Bands products delivered to GRB, PDA -Issued: Mar 19, 2021 2047Z
Product Outage Update #1: GOES-16 - ABI L1b All Bands, Cloud and Moisture All Bands products delivered to GRB, PDA -Issued: Mar 19, 2021 2132Z
Product Outage/Anomaly: GOES-17 - ABI L1b All Bands, Cloud and Moisture All Bands products delivered to GRB, PDA -Issued: Mar 19, 2021 2139Z
Product Outage /Anomaly Correction: GOES-16 - ABI L1b All Bands, Cloud and Moisture All Bands products delivered to GRB, PDA -Issued: Mar 19, 2021 2145Z
Administrative: GOES-16 Meso-2 scheduled for March 20, 2021 - Issued: March 20, 2021 0506Z
Administrative: GOES-17 Meso-2 scheduled for March 20, 2021 - Issued: March 20, 2021 0635Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 20, 2021- Issued: March 20, 2021 1245Z
SARSAT Outage/Anomaly: Maryland 1 MD1 GEO Ground Station Offline. Issued: March 21, 2021 0152Z
Administrative: GOES-16 Meso-2 scheduled for March 21, 2021 - Issued: March 21, 2021 0810Z
SARSAT Outage/Anomaly: Update #1 - (Final Update) Maryland 1 MD1 GEO Ground Station Offline. Issued: March 21, 2021 1008Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 21 2021- Issued: March 21, 2021 1340Z
Administrative (Update #1): GOES-16 Meso-2 scheduled for March 21, 2021 - Issued: March 21, 2021 2250Z
Administrative (Update #1): GOES-16 MDS Request for Meso-1 Scheduled for March 21 2021- Issued: March 21, 2021 2250Z
Administrative: GOES-16 Meso-2 scheduled for March 22, 2021 - Issued: March 22, 2021 0723Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 22, 2021- Issued: March 20, 2021 1103Z
Administrative: Update #1 - PDA 6 Hour Outage for All GOES-16 and 17 Products Due to GOES-16/17 Software Patch (EI.22.00) and COSI 2.4.0 on March 23, 2021 - Issued: March 22, 2021 1130 UTC
Administrative: Maintenance on Geodist6 - Issued March 22, 2021 1407Z
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, March 22nd, 2021 1428Z
Administrative: Metop-C In-Plane Maneuver - Issued March 22, 1508 UTC
Product Outage/Anomaly: DMSP SSMI/S Data Loss - Issued: March 22, 2021 1515Z
Administrative: GOES-16 and GOES-17 ABI Lunar Trending Calibration Scans scheduled for March 27 - March 30, 2021, Issued March 22, 2021 1523 UTC
Administrative GOES GOES West ABI Mode 3 Cooling Timeline 2 Hour Test Implementation March 29 2021 Issued: March 22, 2021 1820UTC
Product/Outage Anomaly: GCOM Data Outage/Delay - Issued: March 23, 2021 0235Z
Product Anomaly: GOES-16 - ABI L1b All Bands products delivered to PDA - Issued: March 23, 2021 0413Z
Administrative: GOES-16 Meso-2 scheduled for March 23, 2021 - Issued: March 23, 2021 0629Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 23, 2021- Issued: March 23, 2021 0630Z
Product/Outage Anomaly: Update #1 GCOM Data Outage/Delay - Issued: March 23, 2021 0751Z
Administrative: Update #2 - PDA 6 Hour Outage for All GOES-16 and 17 Products Due to GOES-16/17 Software Patch (EI.22.00) and COSI 2.4.0 on March 23, 2021 - Issued: March 23, 2021 1200 UTC
Administrative: Product Distribution and Access (PDA) Planned Maintenance activity at the NSOF OPS site, March 23, 2021 1217Z
Product/Outage Anomaly: NPP SMD Data Delay, Issued: March 23, 2021 1438Z
Product/Outage Anomaly: GCOM SMD Data Delay, Issued: March 23, 2021 1507Z
Product/Outage Anomaly: N20 SMD Data Delay - Issued: March 23, 2021 1520Z
Administrative: Planned Maintenance Impacting Legacy Shared Files System (GEOTIDAL) on March 23 - Issued: March 23, 2021 1527Z
Administrative: Update #3 - PDA 6 Hour Outage for All GOES-16 and 17 Products Due to GOES-16/17 Software Patch (EI.22.00) and COSI 2.4.0 on March 23, 2021 - Issued: March 23, 2021 1533Z
Administrative: Update #1 - GOES-17 (GOES-West) ABI Mode 3 CoolingTimeline 2 – Hour Test Implementation March 29, 2021 Issued: March 23, 2021 1545 UTC
Administrative: Update #1, Planned Maintenance Impacting Legacy Shared Files System (GEOTIDAL) on March 23 - Issued: March 23, 2021 1844Z
Administrative: GOES-16 Meso-2 scheduled for March 24, 2021 - Issued: March 23, 2021 2332Z
Administrative: Update #4 - PDA 6 Hour Outage for All GOES-16 and 17 Products Due to GOES-16/17 Software Patch (EI.22.00) and COSI 2.4.0 on March 23, 2021 - Issued: March 24, 2021 0022Z
Product/Outage Anomaly: Missing PDA Data. Issued March 24, 2021 0201Z
Product Anomaly: Update#1 GOES-16 - ABI L1b All Bands products delivered to PDA - Issued: March 24, 2021 0330Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 24, 2021- Issued: March 24, 2021 0722Z
Administrative: Eumetsat Weekly Operations Schedule - Week 12 Issue 2 (Announcements: Update of 6751 and 6820) Issued: March 24, 2021 0950Z
Administrative Critical Weather Day has been declared for March 25, 2021 - Issued: March 24, 2021 1206Z
Product/Outage Anomaly: NPP PRODUCT DELAY Issued: March 24, 2021 1753Z
Product/Outage Anomaly: Update #1 NPP PRODUCT DELAY Issued: March 24, 2021 1932Z
Administrative: GOES-16 MDS request for Meso-2 scheduled for March 25, 2021 - Issued: March 24, 2021 2208Z
Product Outage/Anomaly: DMSP SSMI/S Data loss - Issued March 24, 2021 2231Z
Product Outage/Anomaly (Update #1): DMSP SSMI/S Data loss - Issued March 24, 2021 2316Z
Administrative (Correction): GOES-16 MDS request for Meso-2 scheduled for March 25, 2021 - Issued: March 24, 2021 2324Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 25, 2021- Issued: March 25, 2021 0143Z
Administrative (Update #1): GOES-16 MDS Request for Meso-1 Scheduled for March 25, 2021- Issued: March 25, 2021 0740Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 25, 2021- Issued: March 25, 2021 0743Z
Administrative:_Himawari-8 Weekly Special Satellite Operations Schedule__Issued:_March 25, 2021_1355 UTC
Administrative: ESPC Legacy Firewall Network Maintenance Issued March 25, 2021 1449Z
Administrative: Eumetsat Weekly Operations Schedule - Week 13 (Announcements: ) Issued: March 25, 2021 1608Z
Administrative: Update #2: GOES-16 (EAST) Geostationary Lightning Mapper (GLM) Outage Due to Testing rescheduled to March 30-April 2, 2021 - Issued March 24, 2021 16:10 UTC
Administrative: GOES-17 Yaw Flip Maneuver scheduled for April 6, 2021, Issued March 25, 2021 1645 UTC
Administrative: GOES-17 Yaw Flip Maneuver scheduled for April 6, 2021, Issued March 25, 2021 1650Z
Product/Outage Anomaly: Update #2 NPP PRODUCT DELAY Issued: March 24, 2021 1750Z
Administrative: Update #2 - JPSS Algorithm Updates in IDPS Block 2.3 Maintenance Release Mx 1 Transition to Operations scheduled for March 30, 2021, Issued: March 25, 2021 1905 UTC
Administrative: Update #2 - JPSS Algorithm Updates in IDPS Block 2.3 Maintenance Release Mx 1 Transition to Operations scheduled for March 30, 2021, Issued: March 25, 2021 1912Z
Administrative Update #1: GOES-16 MDS Request for Meso-1 Scheduled for March 25, 2021- Issued: March 26, 2021 0315Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 26, 2021- Issued: March 26, 2021 0315Z
Product Outage/Anomaly: Eumetsat Product Outage: Issued: March 26, 2021 0806Z
Product Outage/Delay: Correction Eumetsat Product Outage: Issued: March 26, 2021 0806Z
Product Outage/Delay Update #1: Correction Eumetsat Product Outage: Issued: March 26, 2021 0952Z
Product Outage/Delay Update #1: Eumetsat Product Outage: Issued: March 26, 2021 0954Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 26, 2021- Issued: March 26, 2021 1105Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 26, 2021- Issued: March 26, 2021 1105Z
Administrative: Update #1: Critical Weather Day has ended for March 25, 2021 - Issued: March 26, 2021 1212Z
Administrative: Eumetsat Weekly Operations Schedule - Week 13 Issue 3 (Announcements: Update of 6784) Issued: March 26, 2021 1353Z
Product Outage Anomaly Alert Message 2021 Issued: March 26 2021 1418Z
Administrative Update #1: GOES-16 MDS Request for Meso-1 Scheduled for March 25, 2021- Issued: March 26, 2021 1730Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 26, 2021- Issued: March 26, 2021 1732Z
Administrative : GOES-17 MDS Request for Meso-1 Scheduled for March 26 2021 Issued: March 26, 2021 1740Z
Product Outage: GOES-17 Sectorized Cloud and Moisture Bands 4, 6, 7 and 8 and derived products delivered to AWIPS Issued: March 26, 2021 1923Z
Product Outage: Update # 1 - Final Update: GOES-17 Sectorized Cloud and Moisture Bands 4, 6, 7 and 8 and derived products delivered to AWIPS Issued: March 26, 2021 1951Z
Administrative : GOES-17 MDS Request for Meso-1 Scheduled for March 27 2021 Issued: March 27, 2021 0927Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 27, 2021- Issued: March 27, 2021 0931Z
Administrative : GOES-17 MDS Request for Meso-1 Scheduled for March 28, 2021 Issued: March 28, 2021 0626Z
Product_Outage Anomaly_Alert_Message_2021 Service Issued: March 28 2021 0642Z
Administrative : GOES-17 MDS Request for Meso-12Scheduled for March 28, 2021 Issued: March 28, 2021 0731Z
Administrative : Correction: GOES-17 MDS Request for Meso-12Scheduled for March 28, 2021 Issued: March 28, 2021 0738Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 28, 2021- Issued: March 28, 2021 0859Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 28, 2021- Issued: March 28, 2021 0906Z
SARSAT Outage/Anomaly: Florida 3 LEO Ground Station Offline, Issued: March 28, 2021 1223Z
SARSAT Outage/Anomaly: Update #1 - (Final Update) Florida 3 LEO Ground Station Offline, Issued: March 28, 2021 1433Z
Product Anomaly: GOES-17 Sectorized Cloud and Moisture multiple Bands and derived products delivered to AWIPS, GRB and PDA- Issued March 28, 2021 2200Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 29, 2021- Issued: March 29, 2021 0755Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 29, 2021- Issued: March 29, 2021 0757Z
Product Outage/Anomoly: Alert Message 2021-03-29 08:28:58 :: GDS-Metop-B-Issued March 29, 2021 0840Z
Administrative: Update #1 GOES-16 MDS Request for Meso-1 Scheduled for March 29, 2021- Issued: March 29, 2021 1422Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 29, 2021- Issued: March 29, 2021 1436Z
Product Outage/Anomoly: Update #1 - Alert Message 2021-03-29 08:28:58 :: GDS-Metop-B: Issued March 29, 2021 1505Z
Product Anomaly: GOES-16 - ABI L1b All Bands products delivered to PDA - Issued: March 29, 2021 1931Z
Administrative: GOES-17 MDS Request for Meso-2 Scheduled for March 29, 2021 Issued: March 29, 2021 2005Z
Product Anomaly: Correction - GOES-16 - ABI L1b All Bands products delivered to PDA - Issued: March 29, 2021 2316Z
Product Anomaly: GOES-16 - ABI L1b All Bands products delivered to GRB, PDA - Issued: March 29, 2021 2329Z
Administrative: Update #3 - JPSS Algorithm Updates in IDPS Block 2.3 Maintenance Release Mx 1 Transition to Operations scheduled for March 30, 2021, Issued: March 30, 2021 1225 UTC
Administrative: Operational Implementation of the Himawari-8 Products in NCCF (NESDIS Common Cloud Framework) scheduled for May 3rd, 2021 Issued: March 30, 2021 1305Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 30, 2021- Issued: March 30, 2021 1321Z
Administrative: Eumetsat Weekly Operations Schedule - Week 13 Issue 5 (Announcements: Addition of 6847, Update of 5475) Issued: March 30, 2021 1305z
Product Outage/Anomaly: DMSP SSMI/S Data loss - Issued March 30, 2021 1417Z
Administrative: Update #3: GOES-16 (EAST) Geostationary Lightning Mapper (GLM) Outage Due to Testing rescheduled to March 30-April 2, 2021 - Issued March 30, 2021 1646 UTC
Product Outage/Anomaly: DMSP SSMI/S Data Delay - Issued: March 30, 2021 1725Z
Product Outage/Anomaly: Update#1 DMSP SSMI/S Data Delay - Issued: March 30, 2021 1834Z
Administrative: GOES-16 MDS Request for Meso-1 Scheduled for March 31, 2021- Issued: March 31, 2021 1125Z
Administrative: GOES-16 MDS Request for Meso-2 Scheduled for March 31, 2021- Issued: March 31, 2021 1127Z
Administrative: GOES-17 (GOES-West) ABI Mode 3 Cooling TimelineImplementation April 8, 2021 – May 4, 2021, Issued: March 31, 2021 1710 UTC
Administrative: Alert Message 2021-03-31 22:15:52 : RDS-EARS- Issued March 31, 2021 2221Z
Administrative Update #1: EARS-ground-segment-anomaly Issued: March 31, 2021 2236Z
The latest message is at the top. To decode the filenames for the messages listed above, MSGXXXHHMM.html, MSG means "Message", XXX is the Julian Date, HHMM is the time of the message in UTC. Files are now saved as html format.